BRIGHT ADS-1 Goniometer
BRIGHT ADS-1 Goniometer has been closed on 08 Jul 2021.
It no longer accepts any bids. For further information,
you can contact the Australian Nuclear Science and Technology Organisation
Bellow, you can find more information about this project:
Description
https://www.tenders.gov.au/Atm/Show/7f067007-cada-43d0-8322-14dc2f5b4ccf
The ADS beamlines are the fifth and sixth beamlines being built within the Australian Synchrotron/ANSTO BR–GHT program. The ADS beamlines project encompasses design, procurement, build/installation and commissioning phases. The beamline will commence user operations in July 2023.
Two simultaneously operating ADS (ADS-1 and ADS-2) beamlines will operate independently with the beam generated by a powerful superconducting multipole wiggler (SCMPW). The supplier shall design and supply a goniometer for the endstation of the ADS-1 beamline.