· Site assessment and report;
· Traffic control measures;
· Removal of existing camera, cabling, power supply, installation ancillaries and their disposal/ recycle;
· New cable haul, including power and communications cables, from TCS cabinet on the roadside, via pits and conduits to the pole and the camera mounting point;
· New camera installation;
· New camera power supply and ancillaries installed within the roadside equipment housing;
· Site documentation including test records, and 'as-built' drawings;
· Pre-arrangement of Road Occupancy license;
· Traffic control plans (TCP) for the site if/as needed;
· Provision of traffic control measures on site during the works (per the TCP);
· Power connection from existing cabinet;
· Installation of 19” rack mount of power supply and communications; and
· CCTV site test, commissioning and acceptance.