Electrical Components Tender has been closed on 16 May 2022.
It no longer accepts any bids. For further information,
you can contact the University of Exeter
Bellow, you can find more information about this project:
General information
Donor:
University of Exeter
Industry:
Electronics & Electrical
Machinery & Equipment
Status:
Closed
Value:
50000
Timeline
Published:
03 May 2022
Deadline:
16 May 2022
Contacts
Name:
Alex Canevali
Phone:
+44 1392721111
Email:
Not available
Description
https://www.contractsfinder.service.gov.uk/Notice/8ea1f821-1a37-4905-8a55-5af0034b957fThe Cornwall Marine Hydrogen Centre (CMHC) will offer independent expertise and testing facilities for hydrogen fuel cell electric propulsion systems for marine vessels.
It will specialise in equipment and systems for leisure and commercial vessels up to 18m in length.
This market, which is estimated to be over 30 million vessels worldwide, is currently powered mostly by diesel, and will need to be replaced by clean propulsion systems to meet Net Zero goals.
Part-funded by an ERDF research grant, the CMHC will be based at the University of Exeter's Renewable Energy faculty in Cornwall.
Individual components or whole hydrogen propulsion systems will be tested and monitored in a purpose-built facility, providing technology providers with independent validation and accelerated product development.
The delivery partners provide a unique blend of world-class Renewable Energy and Marine Engineering expertise.
Pure Energy Professionals (PEP) has a 30-year track record of working with manufacturers and investors in renewable energy and has been at the forefront of new technology adoption.
The University of Exeter is a member of the prestigious Russell Group of research-intensive UK universities, and is in the top ten for renewable energy.
The current focus of the CMHC is to build the test rig, with a demonstration hydrogen electric propulsion system, using commercially available components.
The Electrical components are the items to be procured in this tender.
The purchase, build and commissioning of the test rig and demonstration system must be completed by the end of 2022.Status: activeStreet address: Northcote House Locality: ExeterPostal code: EX4 4QHCountry: ENG