Cancel
Search Tenders
Back to tenders & grants page

Enhancement of the operation of hydropower plant of Litani River Authority (LRA), Machgara,West Bekaa, Lebanon

Enhancement of the operation of hydropower plant of Litani River Authority (LRA), Machgara,West Bekaa, Lebanon has been closed on 30 Sep 2021. It no longer accepts any bids. For further information, you can contact the

Bellow, you can find more information about this project: 

General information
Donor:
Not available
Industry:
Energy & Utilities
Status:
Closed
Value:
Not available
Timeline
Published:
27 Aug 2021
Deadline:
30 Sep 2021
Contacts
Name:
Not available
Phone:
Not available
Email:
Not available
Description
https://api.tech.ec.europa.eu/search-api/prod/rest/document/9219en?apiKey=SEDIA

The Abdel Al Hydropower Plant feeds the overall EDL grid in power and has a substation providing power to 93 villages in Bekaa and South Lebanon.The Abdel Al Hydropower Plant (MARKABI HPP) is the first hydropower plant on Litani River located in West Bekaa near the village of Machgara. Since 1962, its installed capacity is 2x18 MW and it is the master of the cascade of hydroelectric power Plants formed by the following power stations: MARKABI (2x18MW), AWALI (3x36 MW) and JOUN (2x24 MW). The Electric Protection System (EPS) is an essential component of the plant equipment. It consists of a series of electrical relays that protect the grid from electric shortcuts and damage. By time, the EPS is consumed and needs to be replaced to protect the plant from damage

Featured tenders

Get free access to our Tenders & Grants Database

Our service is free of charge and will always be

Join Now