Cancel
Search Tenders
Back to tenders & grants page

F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB

F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB has been closed on 22 Feb 2021. It no longer accepts any bids. For further information, you can contact the DEPT OF DEFENSE.DEPT OF THE ARMY.USACE.NAD.W2SD ENDIST NORFOLK

Bellow, you can find more information about this project: 

General information
Donor:
DEPT OF DEFENSE.DEPT OF THE ARMY.USACE.NAD.W2SD ENDIST NORFOLK
Industry:
Construction & Engineering
Status:
Closed
Value:
Not available
Timeline
Published:
21 Jan 2021
Deadline:
22 Feb 2021
Contacts
Name:
Not available
Phone:
Not available
Email:
Not available
Description
https://sam.gov/opp/19ad7cd5249b4687928bcb3822cce379/view?keywords=&sort=-modifiedDate&index=opp&is_active=true&page=1

This is the solicitation for F22 Consolidated Operations and Maintenance Hangar (COMH), Langley AFB, W9123621R2003.

Provide a six-bay high-bay consolidated operations and maintenance hangar to provide maintenance support for additional F-22A aircraft from Tyndall Air Force Base. Construction includes compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and a standing seam metal roof. The facility will provide all necessary spaces to house hangar bays, staff administration, propulsion shop, ready room, break room, tools/parts support, aircraft maintenance equipment storage, wheel/tire shop, egress shop, restrooms/showers/lockers, and building systems support. The project includes all utilities, site improvements, pavements, detection/protection features, security enhancements, and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable codes and design guides. The project will demolish Facility 753 (7,400 Square Meters). Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria 1-200-1, General Building Requirements. Sustainable principles and life-cycle cost-effective practices will be integrated into the design, development and construction of the project in accordance with Unified Facilities Criteria 1-200-02. This project will comply with Department of Defense minimum antiterrorism requirements in Unified Facilities Criteria 4-010-01. Air Conditioning: 150 Tons

The project duration is 700 calendar days from the notice to proceed, unless CLIN 0013 is exercised in which case the contract completion date will become 565 calendar days from notice to proceed.

This is a bifurcated solicitation. Only Factors 1 and 2 responses are requsted at this time.

Refer to the solicitation document for further details.

Featured tenders

Get free access to our Tenders & Grants Database

Our service is free of charge and will always be

Join Now