FY20 MCAF P-9021/PAF189021 APSI - AIRFIELD DEVELOPMENT, PHASE 1 AND FY20 MCAF P-9022/PAF189022 APSI - PARKING APRON, TINIAN INTERNATIONAL AIRPORT, TINIAN, CNMI has been closed on 08 Feb 2021.
It no longer accepts any bids. For further information,
you can contact the DEPT OF DEFENSE.DEPT OF THE NAVY.NAVFAC.NAVFAC PACIFIC CMD.NAVAL FAC ENGINEEERING CMD PACIFIC
Bellow, you can find more information about this project:
General information
Donor:
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVFAC.NAVFAC PACIFIC CMD.NAVAL FAC ENGINEEERING CMD PACIFIC
The work for this project includes, but is not limited to, site development for Air Force access to Tinian International Airport, including a cleared and level site with paved road access, security fencing, extensive earthwork, drainage, electrical and water utility connections, demolition of WWII-era airfield pavements, construction of a water well, Munitions and Explosives of Concern work, and all other requirements for a complete and usable project. The work will also include one (1) pre-priced option for construction of an aircraft parking apron and taxiways, with associated shoulders, using airfield established concrete and hot mix asphalt standards. The parking apron will be sized for 12 KC-135/KC-46A aircraft and includes hydrant piping and related components to support 12 fuel valve pits. The taxiways are required to meet DoD standards for ground control operations for large frame aircraft. The project includes all necessary supporting components for a complete and usable facility. In accordance with FAR 52.217-7, Option for Increased Quantity – Separately Priced Line Item, the Government may exercise the option by written notice to the Contractor within 360 days of contract award.