The Icelandic Road and Coastal Administration (IRCA) requests bids for a5.4 km-long road section, Snæfellsnesvegur (No. 54). The project includes construction of two new bridges: (1) Bridge over Skraumariver, length 43 meters, and (2) Dunká river, length 52 meters.
The estimated main quantities for the road construction are:
- Road rock cutting 10.100 m3
- Quarry rock cutting 8.800 m3
- Fillings 49.000 m3
- Unusable material for disposal 5.800 m3
- Road wedges 17.200 m3
- Steel pipes 225 m
- Subbase 26.600 m3
- Roadbase 9.700 m3
- Surface dressing 44.700 m2
- Road safety barrier 524 m
The estimated main quantities for Skraumu are:
- Road safety barrier 114 m
- Excavation 400 m3
- Rock cuttings 150 m3
- Rock anchors 15 pcs.
- Fyllings 1300 m3
- Formwork 650 m2
- Reinforcement steel 56.000 kg
- Concrete 340 kg
- Prefabricated units 38 pcs.
- Steelworks 33,4 tonn
The estimated main quantities Dunká are:
- Road safety barrier 136m
- Excavation 1.314 m3
- Rock cuttings 240 m3
- Rock anchors 18 pcs.
- Fillings 2.000 m3
- Formwork 1.310 m2
- Reinforcement 110.000 kg
- Post-tension cables 14.840 kg
- Concrete 755 m3