Installation of Fire alarm control panel Capacitor bank replacement of incoming cable and supplying installing Cassatte AC to the renovated office building of Chief Engineer Electrical Hydro project at Honkong shanghai Bank Building 4th floor F
Installation of Fire alarm control panel Capacitor bank replacement of incoming cable and supplying installing Cassatte AC to the renovated office building of Chief Engineer Electrical Hydro project at Honkong shanghai Bank Building 4th floor F has been closed on 30 Oct 2018. It no longer accepts any bids. For further information, you can contact the CE (Electrical) Hydro Electric Projects Mumbai
Bellow, you can find more information about this project: