Overview : Consultancy services for a National Expert in Public Finance for the UNDP/GEF ‘Mainstreaming Invasive Alien Species (IAS) Prevention, Control and Management’ project Background The ‘Mainstreaming Invasive Alien Species (IAS) Prevention, Control and Management’ project seeks to safeguard globally significant biodiversity in vulnerable ecosystems, through the prevention, control, and management of Invasive Alien Species (IAS) in the Republic of Mauritius through strengthening the systemic, institutional and operational capacity Scope of work The National Expert Public Finance, under the leadership of Project Manager, Chief Technical Advisor and the National Project Director, is required to develop the Mourouk Valley fully costed yearly Operational plan for five year period and design cost recovery programme schemes to contribute to the sustainability of biosecurity operation. He/she will assess the needs/gaps of the current management status and propose a budget for the planned activities will be developed, indicating the sources of financing and calculations; sustainable financing and resource mobilization. A holistic approach will be developed for long terms enabling activities and will comprise of the following: • Cost of operation of each designated area: conservation, recreation, education zone etc; • Estimation of the economic benefits of ecosystem services of the area, cost-benefit analysis; • Financing sources, considering traditional public funding but also market-based instruments; lack of funding, staff costs, reproduction,conservation and protection of forests, forest management, wildlife, etc.; Deliverables Item | Project Activities/deliverables | Time schedule | Payment schedule (%) | | 1 | Produce a detailed assignment work plan based on the objectives and approaches outlined above including a detailed assignment methodology | April-22 | 5 | | 2 | Consultative workshop/meetings with Stakeholders. | April-22 | 20 | | 3 | Production of a draft comprehensive Costed Action Plan. | May-22 | 25 | 4 | Technical support workshops/consultative meeting | Jun-22 | 10 | 5 | Production of Costed Action Plan and facilitate incoorperation in the Management plan | Jun-22 | 25 | 6 | Production of a financial sustainability plan | Jul-22 | 10 | 7 | Production of a completion report describing the process for the development of the Financial plan | Jul-22 | 5 | | Total | 100 | |
Duration The duration of the consultancy service will be for 20 working days over 4 months from March 2022 until July 2022 Submission of Application Applications should be sent through email: procurement.mu@undp.org on or before Friday 18 March 2022 16:00 hours Mauritius time (GMT+4) Annexes Annex A - Letter of confirmation of interest and availability and Submission of financial proposal Annex B - Model Contact IC Annex C - UNDP GCC IC Annex D - P11 Terms of Reference |