Provision and Installation of A/C Units and Demonstration of the Performance of Low-GWP Technology

Provision and Installation of A/C Units and Demonstration of the Performance of Low-GWP Technology has been closed on 21 Jun 2018. It no longer accepts any bids. For further information, you can contact the United Nations Development Programme

Bellow, you can find more information about this project: 

General information
Donor:
United Nations Development Programme
Industry:
Defence & Security
Transport & Logistics
Construction & Engineering
Consumer Goods & Services
Status:
Closed
Value:
Not available
Timeline
Published:
31 May 2018
Deadline:
21 Jun 2018
Contacts
Name:
UNDP Kuwait Procurement
Phone:
+965 25308000
Email:
Not available
Description

Countries with high ambient temperatures (HAT) have a high demand for air-conditioning equipment, most of which is currently are based on HCFC or HFC refrigerants. In 2014 approximately 45 per cent of the HCFC-22 consumed in Kuwait, was in servicing air-conditioning equipment.

The Multilateral Fund for the implementation of the Montreal Protocol supports countries in their efforts to phase out ozone depleting and high GWP refrigerants and has provide funding to the government of Kuwait to conduct a demonstration project in the air-conditioning sector.

------

Bids must be submitted in the online eTendering system in the following link: https://etendering.partneragencies.org using your username and password. If you have not registered in the system before, you can register now by logging in using

username: event.guest

password: why2change

and follow the registration steps as specified in the system user guide.

------

The aim of the project is to demonstrate the operation of two types of air-conditioning equipment:

1.            HFC-32 based split air-conditioners (one unit)

2.            HC-290 based mini-chiller (one unit)

The equipment will be installed in four locations to be agreed in consultation with supplier, the technical expert, the national ozone unit (NOU) and the Kuwait Institute for Scientific Research (KISR).  These are likely to be mosque, a commercial office and a household for the split units and on the premises of KISR for the chiller.

 

The project will include the supply, installation, commissioning and ongoing monitoring of the 2 systems mentioned above as well as periodic analysis of the data collected, the preparation of performance reports and the training of up to 10 KISR staff in the setup and monitoring of air-conditioning systems

 

The performance of both types of equipment will be monitored and evaluated taking into consideration performance of the system, energy efficiency and power consumption, and will be compared with HCFC-22 and R-410a-based equipment of similar size and capacity.