Replacement of Bailey Bridge by RCC bridge (Length- 48.00 mtr.) over Sarma River at Bankarghat on Bankarghar road at ch. 1.00 Km, sanctioned for implementation of under NABARD ( RIDF - XX), Job No TP/COM/36/2014-15 (4th Call)
Replacement of Bailey Bridge by RCC bridge (Length- 48.00 mtr.) over Sarma River at Bankarghat on Bankarghar road at ch. 1.00 Km, sanctioned for implementation of under NABARD ( RIDF - XX), Job No TP/COM/36/2014-15 (4th Call) has been closed on 18 Feb 2020. It no longer accepts any bids. For further information, you can contact the Chief Engineer, PWD (R and B)
Bellow, you can find more information about this project: