II.2.4)Description of the procurement:
The Design and Build component will involve Works at seven out of MWSC’s eight water treatment plants (WTP) in the three towns namely: Chililabombwe, Chingola and Mufulira. Whereas seven water treatment plants have been prioritized for work, the Employer may require the contractor to undertake brief technical studies on the eighth water treatment plant and the sewerage treatment facilities at no extra cost to the Employer. The Design and Build component will also involve upgrading three bulk water mains in Chingola.
The scope of work will differ from site to site as set out further on in the Employer’s Requirements. Some treatment plants will require minor works such as replacement of electrical and mechanical equipment whereas others would require extensive rehabilitation/ refurbishment of electrical and mechanical and, in some cases, structural elements of the treatment plants. The Kafue WTP at Chingola, presently operating at 40MLD requires refurbishment works at the existing facilities as well as an additional 20MLD minimum extension works.
II.2.5)Award criteriaQuality criterion - Name: CHINGOLA Kafue Water Treatment Plant (Refurbishment Works and 20 MLD Extension Works) / Weighting: 348.78
Quality criterion - Name: Bulk Water Pipelines / Weighting: 71.51
Quality criterion - Name: Bulk Water Pipelines / Weighting: 87.18
Quality criterion - Name: Sewage Treatment Ponds – Chingola, Chililabombwe, Mufulira / Weighting: 25.05
Quality criterion - Name: Value Addition / Weighting: 51.26
Quality criterion - Name: Quality of Technical Proposal Approach and Methodology / Weighting: 246.91
Quality criterion - Name: Equipment / Weighting: 17.54
Quality criterion - Name: Firms and their Key Personnel / Weighting: 384.82
Quality criterion - Name: Sub-Contractors / Weighting: 91.00
Cost criterion - Name: C (ZMW) / Weighting: ZMW 670,657,828.56
Cost criterion - Name: C (EUR) / Weighting: EUR 45,927,288.88
Cost criterion - Name: C_low (ZMW) / Weighting: ZMW 665,049,124.72
Cost criterion - Name: X / Weighting: 0.4
Cost criterion - Name: T / Weighting: 88.26 %
Cost criterion - Name: T_high / Weighting: 88.26 %
Cost criterion - Name: (1-X) / Weighting: 0.6
Cost criterion - Name: B / Weighting: 99.67 %