Bosnia and Herzegovina-Sarajevo: EIB - Construction of motorway has been closed on 22 Sep 2017. It no longer accepts any bids. For further information, you can contact the “Autoceste Federacije Bosne i Hercegovine” Ltd. Mostar
Bellow, you can find more information about this project:
Location: Bosnia-Herzegovina
“Autoceste Federacije Bosne i Hercegovine” Ltd. Mostar
Machinery & Equipment
Closed
26 Jul 2017
22 Sep 2017
Not available
INTERNATIONAL INVITATION FOR PREQUALIFICATION
CONSTRUCTION OF MOTORWAY ON CORRIDOR Vc, SECTION POPRIKUŠE-ZENICA NORTH (DONJA GRAČANICA), SUBSECTION PONIRAK-VRACA, JPAC 851-B83-17
Public company “Autoceste Federacije Bosne i Hercegovine” Ltd. Mostar on behalf of Government of Federation of Bosnia and Herzegovina
The Bosnia and Herzegovina (hereinafter referred to as “the Borrower”) has received a loan from the European Investment Bank – EIB (hereinafter referred to as “the Bank”) – towards the cost of the construction of priority sections of the motorway on the route of Pan European Corridor Vc through Bosnia and Herzegovina. This International Invitation for Prequalification relates to the contract for „Construction of motorway on Corridor Vc, Section Poprikuše- Zenica north (Donja Gračanica), Subsection Ponirak - Vraca.“
This contract will include:
• Contract No. JPAC 851-B83-17: Construction of motorway on Corridor Vc, Section Poprikuše-Zenica north (Donja Gračanica), Subsection Ponirak - Vraca in total length of 2,65 km
Subsection starts on the western Drenovac hillside, above the Ponirak settlement. At the length of about 90 m, the alignment runs in steeply inclined slope and it is expected that for the purpose of slope stabilization, special geotechnical solutions will have to be applied. Route then crosses over a steady stream and access road to settlement of Ponirak (construction of the watercourse regulation and underpass, which enables communication with the hinterland is foreseen). At 0+150 m alignment enters into the northern portal of the tunnel Zenica. At the southern tunnel exit alignment runs in steep slope approximately at the chainage km 2+610. Section ends on the Gaje hillside, east from the settlement Donja Vraca, at km 2+650. The total length of the open alignment on this subsection is about 150 m and the tunnel length is approximately 2500 m or 94% of the works. Main structure on this subsection is Tunnel “Zenica”. Left tunnel tube starts at the chainage 0+135 and has a length of 2475m while right tunnel tube starts at the chainage 0+136 and has a length of 2420 m. Axis of the tunnel tubes are designed at a distance of 25 m.
This contract is expected to be implemented from Q2 2018 and its estimated duration is 30 months.
The criteria to be used in the tender evaluation are:
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page