CW WTP Simoro: Construction of Simoro Water Treatment Plant 300 LPS has been closed on 12 Jan 2022.
It no longer accepts any bids. For further information,
you can contact the Asian Development Bank
https://devbusiness.un.org/content/cw-wtp-simoro-construction-simoro-water-treatment-plant-300-lps Invitation for Bids Date: 17 December 2021 Loan No. and Title: Loan 3793-INO: Emergency Assistance for Rehabilitation and Reconstruction (EARR) Project Contract No. and Title: CW WTP Simoro: Construction of Simoro Water Treatment Plant 300 LPS Deadline for Submission of Bids: 12 January 2022; 10:00 hours (Central Indonesian Time) 1. The Government of the Republic of Indonesia has received financing from the Asian Development Bank (ADB) toward the cost of Emergency Assistance for Rehabilitation and Reconstruction (EARR) Project. Part of this financing will be used for payments under the Contract named above. Bidding is open to Bidders from eligible source countries of ADB. 2. The Sulawesi III River Basin Organization, Central Sulawesi Province, Directorate General of Water Resources, Ministry of Public Works and Public Housing (“the Employer”) invites online bids/tenders from eligible Bidders for the Construction of Simoro Water Treatment Plant 300 LPS (“the Works”). 3. Open Competitive Bidding (National Advertisement) will be conducted in accordance with ADB’s Single-Stage: One-Envelope procedure and is open to all Bidders from eligible source countries as described in the Bidding Document. 4. Only eligible Bidders with the following key qualifications should participate in this bidding: ● Minimum average annual construction turnover of IDR 144,352,000,000 calculated as total certified payments received for contracts in progress or completed, within the last five (5) years (2016-2020). ● Participation in at least one (1) contract that has been successfully completed within the last ten (10) years (2010-2020), and that is similar to the proposed works in construction of water treatment plants (WTP) and or water reservoir where the value of the Bidder’s participation exceeds IDR 72,176,000,000. ● For the above or other contracts executed during the period stipulated above, a minimum construction experience in the following key activities: – Construction of Water Treatment Plant with minimum capacity of 300 L/s – Construction of fused glass-based reservoir with minimum capacity of 2,000 m 3 – Construction of bore piles minimum diameter 60 cm – SCADA system. The qualification criteria are more completely described in the Bidding Document. 5. To obtain the Bidding Document, interested Bidders should download from the website (SPSE 4.4): https://lpse.pu.go.id/eproc4/lelang/76281064/pengumumanlelang. 6. This is an online bidding where only e-Tender (e-bid) will be accepted through SPSE (Government’s e-procurement platform) and no offline/hard copies will be accepted. To obtain further information and to submit e-Tender for this works package bearing e-tender ID no. mentioned above, registration in the SPSE e-Procurement platform (https://lpse.pu.go.id/eproc4/) is required. The guideline to register in the SPSE is available at the above platform. 7. If any query pertaining to registration or access to Bidding Document or technical issue to submit the bids, the Bidders may contact PUSDATIN email address at
[email protected] copied to the procurement committee email address at
[email protected]. Bidders are encouraged to register early to enable careful study of the Bidding Document and avoid last minute submission of the bids. 8. The deadline for submission of e-Tender (bids) is on 12 January 2022 at 10:00 hours Central Indonesian Time. Late bid submission will be automatically rejected by the SPSE system. Please deliver your bid through the above SPSE platform, together with a bid security as described in the Bidding Document. The original bid security can be submitted directly or sent via document delivery services. Electronic bid opening procedure shall be as follows: The Employer shall download and open all Technical and Financial Proposals submitted in pdf format by the Bidders through SPSE by the prescribed deadline above. Bid prices will be disclosed in the SPSE subsequently. Loan 3793-INO: Emergency Assistance for Rehabilitation and Reconstruction (EARR) Project Indonesia Not cancelled Invitation for Bids Goods Non-Consulting Services Works Wednesday, January 12, 2022- 00:01 ADB-P894957-12/21 Loan 3793-INO CW WTP Simoro Construction Water, Sanitation and Waste Management Friday, December 17, 2021 English Friday, December 17, 2021- 17:53 Asian Development Bank