NURU Sarl has announced on 29 Jun 2021 that is accepting bids for the following project: Democratic Republic of the Congo-Goma: Construction works for power plants and heating plants.
The tender will take place in Congo (DRC) and will cover the Construction & Engineering industry.
The value of this project has not been disclosed by the donor and you can apply until Deadline date
After the deadline, Global Database will announce the contract award for Democratic Republic of the Congo-Goma: Construction works for power plants and heating plants. In order to stay up-to-date with this tender and also to receive daily notifications about similar projects, you can subscribe to our newsletter for free.
Bellow you can find more information about the tender description and the bidding procedure.
Location: Congo (DRC)
NURU Sarl
Construction & Engineering
Accepting bids
29 Jun 2021
Not available
Not available
+243 799873036
Prior information notice
This notice is for prior information only
Works
This project is financed by European Investment Bank and is subject to EIB's Guide to Procurement
Section I: Contracting authority
Section II: Object
Hybrid Solar Off-grid Power Generation and Distribution (NURU)
The contract will be offered on a Engineer Procure Construct/Turnkey (EPC) basis for the development of three off-grid, hybrid solar mini grids, of approximately 3.7 MWp, 2 MWp and 8 MWp comprised of six lots, one generation and one distribution network for each site. There are no restrictions or preference on the number of lots that may be bid on. Construction of the various lots is not expected to occur simultaneously. The procurement process will use a Standard Procurement Document (SPD) Request for Proposals (RFPs) for Works (Engineer Procure Construct/Turnkey (EPC), under international competitive procurement, without Initial Selection, for a Two stage Request for Proposals (RFP) selection method. The SPD incorporates provisions to reflect Environmental and Social obligations.
Bunia Generation
PV-battery hybrid electricity generation plant (approx. 8 MWp PV capacity) with backup generation.
Bunia Distribution
Medium and low voltage electrical distribution network.
Kindu Generation
PV-battery hybrid electricity generation plant (approx. 2 MWp PV capacity) with backup generation.
Kindu Distribution
Medium and low voltage electrical distribution network.
Goma Generation
PV-battery hybrid electricity generation plant (approx. 3.7MWp PV capacity) with backup generation.
Goma Distribution
Medium and low voltage electrical distribution network.
Section IV: Procedure
Section VI: Complementary information
A Market Test will be organized on-line with the potential interested firms on 14 July 2021 between 9.00 and 12 a.m. (Luxembourg time). Interested firms shall register their interest, by sending a request to participate note to [email protected], thereafter links will be distributed accordingly.
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page