Back to tenders & grants page
Enhancement of the operation of hydropower plant of Litani River Authority (LRA), Machgara,West Bekaa, Lebanon Energy & Utilities Enhancement of the operation of hydropower plant of Litani River Authority (LRA), Machgara,West Bekaa, Lebanon
Receive Tenders like this by email

Enhancement of the operation of hydropower plant of Litani River Authority (LRA), Machgara,West Bekaa, Lebanon

Enhancement of the operation of hydropower plant of Litani River Authority (LRA), Machgara,West Bekaa, Lebanon has been closed on 30 Sep 2021. It no longer accepts any bids. For further information, you can contact the

Bellow, you can find more information about this project: 

Location: Lebanon

General information

Donor:

Not available

Industry:

Energy & Utilities

Status:

Closed

Timeline

Published:

27 Aug 2021

Deadline:

30 Sep 2021

Value:

Not available

Contacts

Description

https://api.tech.ec.europa.eu/search-api/prod/rest/document/9219en?apiKey=SEDIA

The Abdel Al Hydropower Plant feeds the overall EDL grid in power and has a substation providing power to 93 villages in Bekaa and South Lebanon.The Abdel Al Hydropower Plant (MARKABI HPP) is the first hydropower plant on Litani River located in West Bekaa near the village of Machgara. Since 1962, its installed capacity is 2x18 MW and it is the master of the cascade of hydroelectric power Plants formed by the following power stations: MARKABI (2x18MW), AWALI (3x36 MW) and JOUN (2x24 MW). The Electric Protection System (EPS) is an essential component of the plant equipment. It consists of a series of electrical relays that protect the grid from electric shortcuts and damage. By time, the EPS is consumed and needs to be replaced to protect the plant from damage

Get free access to our Tenders & Grants Database

Our service is free of charge and will always be

Join Now

Donors

Find out more