Enhancement of the operation of hydropower plant of Litani River Authority (LRA), Machgara,West Bekaa, Lebanon has been closed on 30 Sep 2021. It no longer accepts any bids. For further information, you can contact the
Bellow, you can find more information about this project:
Location: Lebanon
Not available
Energy & Utilities
Closed
27 Aug 2021
30 Sep 2021
Not available
The Abdel Al Hydropower Plant feeds the overall EDL grid in power and has a substation providing power to 93 villages in Bekaa and South Lebanon.The Abdel Al Hydropower Plant (MARKABI HPP) is the first hydropower plant on Litani River located in West Bekaa near the village of Machgara. Since 1962, its installed capacity is 2x18 MW and it is the master of the cascade of hydroelectric power Plants formed by the following power stations: MARKABI (2x18MW), AWALI (3x36 MW) and JOUN (2x24 MW). The Electric Protection System (EPS) is an essential component of the plant equipment. It consists of a series of electrical relays that protect the grid from electric shortcuts and damage. By time, the EPS is consumed and needs to be replaced to protect the plant from damage
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page