Back to tenders & grants page
Eritrea-Asmara: EDF — Supply, installation and commissioning of PV generation system for the Areza Maidma solar PV mini-grid project Electronics & Electrical Eritrea-Asmara: EDF — Supply, installation and commissioning of PV generation system for the Areza Maidma solar PV mini-grid project
Receive Tenders like this by email

Eritrea-Asmara: EDF — Supply, installation and commissioning of PV generation system for the Areza Maidma solar PV mini-grid project

The Government of the State of Eritrea has announced on 29 Apr 2016 that is accepting bids for the following project: Eritrea-Asmara: EDF — Supply, installation and commissioning of PV generation system for the Areza Maidma solar PV mini-grid project.

The tender will take place in Eritrea and will cover the Electronics & Electrical industry.

The value of this project has not been disclosed by the donor and you can apply until Deadline date

After the deadline, Global Database will announce the contract award for Eritrea-Asmara: EDF — Supply, installation and commissioning of PV generation system for the Areza Maidma solar PV mini-grid project. In order to stay up-to-date with this tender and also to receive daily notifications about similar projects, you can subscribe to our newsletter for free.

Bellow you can find more information about the tender description and the bidding procedure.

Location: Eritrea

General information

Donor:

The Government of the State of Eritrea

Industry:

Electronics & Electrical

Status:

Accepting bids

Timeline

Published:

29 Apr 2016

Deadline:

Not available

Value:

Not available

Contacts

Description

Supply contract prior information notice

Location — Areza-Maidma, southern region, Eritrea

 1.Publication reference:

EuropeAid/138027/IH/SUP/ER.
 2.Procedure:

Open.
 3.Programme title:

‘Solar PV mini-grids for 2 rural towns and surrounding villages in Eritrea’.
 4.Financing:

Financing agreement EDF/2014/344342 funded in the framework of the ACP–EU energy facility.
 5.Contracting authority:

The Government of the State of Eritrea, represented by the Ministry of Energy and Mines, Asmara, ERITREA.
 6.Contract description:

The project is a 2,7 MW solar PV mini-grid system to supply power to 2 rural towns and surrounding villages. The project has 2 main components, the energy generation system (this supply contract prior information notice) and equipment and materials for the distribution system (already published under ref. EuropeAid/137890/IH/SUP/ER).
 7.Indicative number and titles of lots:

1 lot.
 8.Intended timing of publication of the contract notice:

May 2016.
 9.Additional information:

Not applicable.
 10.Legal basis:

Annex IV to the Partnership Agreement between the members of the African, Caribbean and Pacific Group of States of the one part, and the European Community and its Member States, of the other part, signed in Cotonou on 23.6.2000 as amended in Luxembourg on 25.6.2005 and in Ouagadougou on 22.6.2010. Reference is made to Annex IV as revised by Decision No 1/2014 of the ACP–EU Council of Ministers of 20.6.2014.


Remarks:

There must be a minimum period of 30 calendar days between the publication of this prior information notice and the publication of the corresponding contract notice.

No applications or requests for further information should be sent at this stage.


http://ted.europa.eu/udl?uri=TED:NOTICE:147719-2016:TEXT:EN:HTML&src=0&tabId=2

Get free access to our Tenders & Grants Database

Our service is free of charge and will always be

Join Now

Donors

Find out more