Location: Australia

General information

Donor:

Department of Defence - DSRG

Industry:

Consulting

Status:

Closed

Timeline

Published:

22 Jul 2021

Deadline:

18 Aug 2021

Value:

5000000

Contacts

Name:

Emily Windle

Phone:

0477109255

Description

https://www.tenders.gov.au/Atm/Show/246c0e50-48e1-412e-b5ef-7f14c0191ac3

EST02039 - Borneo Barracks Redevelopment Project - Invitation to Register Interest – Design Services Consultant (DSC-1)


Contact Details

Emily Windle

:
0477109255

:


:
AZ6340
:
Department of Defence - DSRG
:
72100000 - Building construction and support and maintenance and repair services
:
18-Aug-2021 12:00 pm (ACT Local Time)
Show close time for other time zones
:
22-Jul-2021
:
QLD
:
Request for Tender

:
No
:
No
:
Yes
:
The multi-stage criteria are described in the Invitation to Register Interest.

:

The services include design and related services in respect of the following works:

1. New infrastructure to connect to Council sewer network, Sewerage Treatment Plant (STP) demolition and remediation and sewer network infrastructure upgrades

Validation of the proposed connection to council sewer network. Connection into council sewerage network with new rising main and associated pump station/s sized to meet current and future Base requirements. Demolition and remediation of existing STP.

Repair and replacement of Base sewer infrastructure co-ordinated with council network connection to meet current and future Base requirements.

2. New Main Entry Precinct

New Base entry facilities addressing safety and modernisation of existing security infrastructure. Provision of car parking to meet new entry precinct requirements.

3. ICT upgrades

Investigate and validate requirements for communications upgrades to existing ICT to meet current and future Base requirements to be compliant with Tier 3 requirements, including the development of a Master Plan.

4. Fire fighting water upgrades

Upgrades to the current fire fighting system to comply with current and future Base requirements. Ensuring Defence Manual of Fire Protection Engineering standards and other provider requirements are achieved.

5. Electrical upgrades/Central Emergency Power Station (CEPS)

Development of a Master Plan of Base power requirements, including the defining of no loss/fail requirements to establish emergency power requirements. HV ring main, transformers and power factor correction. Compliant CEPS that ensures the safe and reliable supply of electricity across the Base by maintaining backup power supply. Ensuring upgrades are compliant with Australian Standards and the Defence Manual of Infrastructure Engineering - Electrical.

6. Potable water upgrades

The Base's water network is required to be replaced and upgraded to a standard that is able to comply with the current and future Base needs.

7. Demolition of redundant assets

Demolition of redundant assets and infrastructure in accordance with Defence policies and requirements.

8. Provision of Services for Living In Accommodation (LIA) precinct and provision of LIA

Development of a Master Plan for the provision of LIA facilities within the EBP Domestic Zone area with consideration of site, environmental and services infrastructure requirements of the area. Provision of services infrastructure to begin realisation of the new LIA precinct. LIAs to be constructed in accordance with the Domestic Zone Master Plan.

9. Stormwater upgrades

Undertake upgrades to the stormwater system to ensure it is compliant with all requirements and has the ability to support the current and future Base needs.

10. Fuel and Gas

Local Emergency Generators for the powerhouse will no longer be required once the new CEPS is established and hence the powerhouse will be demolished.

11. Studies and Investigations

Traffic study and LIA Master Plan assessment to be conducted to support the Estate Base Plan and the current and future Base requirements.

12. Road and Footpath works

Improvements to Base road and pedestrian infrastructure to maintain safety and meet current and future Base requirements

:

DSC Contract Update

Applicants should note that the DSC-1 (2003) templates are currently the subject of review and amendment by the Commonwealth and may be republished on DEQMS (in the form of the DSC-1 2021 and associated templates). Subject to the timing of such review, the Commonwealth may use those republished templates (including the Conditions of Contract) as the base for the request for tender documentation.

Industry Briefing

An industry briefing will not be conducted.

Building Code 2016

The Building Code 2016 does not apply.

Joint Bids

The Commonwealth does offer applicants an opportunity to lodge a Registration of Interest on a Joint Bid Basis. Further information regarding Joint Bids is provided in the Invitation to Register Interest.

PWC Act

The works described in the Invitation to Register Interest are a "public work" and therefore subject to section 18 of the Public Works Committee Act 1969 (Cth).

Evaluation Criteria

The evaluation criteria are described in the Invitation to Register Interest.

Minimum Form and Content Requirements

The minimum form and content requirements are described in the Invitation to Register Interest.

Conditions for Participation

The conditions for participation are described in the Invitation to Register Interest.

:

The conditions for participation are described in the Invitation to Register Interest.

:

The award date for the contract is anticipated to be in or about November 2021, with completion in or about September 2027.

Estimated Value (AUD):
From $5,000,000.00 to $10,000,000.00
:

Tenders are to be lodged electronically using AusTender at www.tenders.gov.au.


Contact Details

Emily Windle