Electricity Supply Board (ESB) (N/A) has announced on 24 Apr 2019 that is accepting bids for the following project: Ireland-Dublin: Installation services of gas turbines.
The tender will take place in Ireland and will cover the Oil & Gas industry.
The value of this project has not been disclosed by the donor and you can apply until Deadline date
After the deadline, Global Database will announce the contract award for Ireland-Dublin: Installation services of gas turbines. In order to stay up-to-date with this tender and also to receive daily notifications about similar projects, you can subscribe to our newsletter for free.
Bellow you can find more information about the tender description and the bidding procedure.
Location: Ireland
Electricity Supply Board (ESB) (N/A)
Oil & Gas
Accepting bids
24 Apr 2019
Not available
Not available
Qualification system – utilities
This notice is a call for competition
Works
Section I: Contracting entity
Section II: Object
Design and Build Gas Turbine Peaker Plants
Ireland and UK
ESB is seeking expressions of interest to obtain a place on a qualification system that will be established for companies to design, procure, supply, install and commission gas turbine peaking power plants. The projects will be located in Ireland and the UK, and the qualification system may include projects developed by ESB, ESB Joint Venture companies (existing or yet to be formed), ESB subsidiary companies or companies ESB Group has a minority interest in. Applicants must be able to provide the full scope of services of a gas turbine peaking power plant design and build contractor, including all associated construction, balance of plant and grid connection works. It is envisaged that some of the gas turbine peaking plant projects awarded under this qualification system may incorporate an element of balance of plant activities associated with battery energy storage systems which have been delivered by third parties under an EPC/Design and Build scope procured under a separate process.
ESB plans to develop gas turbine peaking power plants commencing in 2019, through a pipeline of planned projects. The size of individual projects is expected to range between 50 MW and 120 MW, although some projects could be outside of this range. Applicants should note that the detailed scope and contracting strategy for each project will be determined in any subsequent procurement competition (which may include a further pre-qualification process before the tender phase) and may include some or all of the scope items identified above.
Section III: Legal, economic, financial and technical information
Details of the contract performance conditions will be provided in the tender documentation.
Section IV: Procedure
Section VI: Complementary information
It is our intention to use the Irish Government Procurement portal (www.etenders.gov.ie) for this competition (e-Tenders Ref No. 149720). Interested parties must register their interest on the e-Tenders website. Registration is free of charge. All information relating to and including the qualification documents, any clarifications and changes will be issued/published via this portal. The contracting entity will not accept responsibility for information relayed (or not relayed) via third parties.
Further information on this procurement process is set out in the Qualification documentation. Completed questionnaires are required on or before the administrative closing date specified in eTenders.
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page