Package No. BWDB/Kish/HFMLIP/PW-18. Re-Excavation of Khal (a) Pangair Dair Khal from KM 0.080 to KM 4.360=4.280 KM, (b) Bera Khal from KM 0.520 to KM 2.030=1.510 KM, (c) Gokhra khal from KM 0.185 to KM 0.910=0.725 KM (Part-A), (d) Neora Khal from KM 0.120 to KM 2.635=2.515 KM, (e) Nandir Khal from KM 0.00 to KM 5.985=5.985 KM, (f) Khaiyar Khal from KM 0.495 to KM 8.405=7.910 KM and (g) Markhali Khal from KM 1.01 to KM 4.120=3.11 KM(Part-B)Total=26.035) & Construction of Causeway (a) Dheuhal Khal (4.00m) at km 12.44, (b) Khaiyar Khal (4.00m) at km 24.06, (c) Markhali Khal (6.60m) at km 39.07 & (d) Neora Khal (4.00m) at km 44.20 of Naogaon Haor Sub-Project (Part-B) in c/w Haor Flood Management and Livelihood Improved Improvement Project(BWDB Part) under Kishoregange WD Division, BWDB, Kishoregonj during the FY2017-18 & 2018-19. Special Instructions: 01. Tenderers should visit the working site before submission of tender. 02. RDPP is in approval process,Notification of Award (NOA) will be issued after approval of RDPP. 03. No claim what so ever will be entertained if NOA is not issued. 04. The work of the packages may be totally dropped, decrease or increase as per field condition/design/budget allocation for which no claim shall be entertained. 05. According to PPA 2006 Act 7(3) (Amendment) The Tenders having quoted the offer in percentage is more than 10%(ten percent) above or less than 10%(ten percent) less of the official estimated cost will be rejected. 06. In case of credit line certificate, it should be in Letter of Commitment for Bank's under taking for Line of Credit(Form PW3-7) that attached in section -8. No alteration is allowed, in failing, tender may not be accepted. In case of Bank Statement, the amount of minimum balance shall remain constant of Tk. 250.00 Lakhs during the evaluation period. During verification, required amount of Liquid Asset i has been closed on 02 Nov 2017. It no longer accepts any bids. For further information, you can contact the Kishoreganj WD Division
Bellow, you can find more information about this project:
Location: Bangladesh
Kishoreganj WD Division
Beverages
Construction & Engineering
Closed
02 Oct 2017
02 Nov 2017
Not available
0941-61842
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Tender
24 Nov 2020
Bangladesh
Procurement of Lab items for ECTAD 505/USA project
Tender
02 Oct 2017
Bangladesh
Package No.:BWDB/ Kish /HFMLIP/PW-09.
Construction of new Regulator 1- vent (1.50m x1.80m) at km 19.90 in Karpasha, 1- vent (1.50m x1.80m) at km 35.20 in Hazirkhali, 2- vent (1.50m x1.80m) at km17.10 in Dampara & 2- vent (1.50m x1.80m) at km 23.40 in Baniajanj of Boro haor(Nikli) Sub-Project in c/w Haor Flood Management and Livelihood Improvement Project under Kishoregonj WD. Division, BWDB, Kishoregonj during the year 2017-18 & 2018-19.
Kishoreganj WD Division
Tender
02 Oct 2017
Bangladesh
Temporary Bank Protection work of the left bank of Paira river from km 0.500 to km 0.636 =136 m at Baherchar of Dumki Lawkathi sub-project under Patuakhali O&M Division, BWDB, Patuakhali during the year 2017-18
Patuakhali O&M Division
Tender
02 Oct 2017
Bangladesh
River dredging work at main channel of Sangu river of length 2.400 km. at Khurushkul Godar Par, Fokirhat and Sarenga under Polder No.-63/1A in connection with "Rehabilitation of Coastal Polder No.-62 Patenga 63/1A Anowara 63/1B Anowara & Patiya in Chittagong District" in Upazila- Anowara District- Chittagong during the year 2017-18.
Chittagong O&M Division-1
Tender
02 Oct 2017
Bangladesh
Celebration of victory day on the 16th December/2017 at jatio Parade square at S.B Nagar, Dhaka. (S.H: Repairing works in both side of east side shoulders of runway front of Band stand)
Shere Bangla Nagar PWD Division-3
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page