Back to tenders & grants page
Phase 1 - AHU Installation (Chiller Project) @ Good Hope Hospital Machinery & Equipment , Information Technology Phase 1 - AHU Installation (Chiller Project) @ Good Hope Hospital
Receive Tenders like this by email

Phase 1 - AHU Installation (Chiller Project) @ Good Hope Hospital

Phase 1 - AHU Installation (Chiller Project) @ Good Hope Hospital has been closed on 21 Jan 2021. It no longer accepts any bids. For further information, you can contact the University Hospitals Birmingham NHS Foundation Trust

Bellow, you can find more information about this project: 

Location: United Kingdom

General information

Donor:

University Hospitals Birmingham NHS Foundation Trust

Industry:

Machinery & Equipment

Information Technology

Status:

Closed

Timeline

Published:

14 Jan 2021

Deadline:

21 Jan 2021

Value:

Not available

Contacts

Description

https://www.contractsfinder.service.gov.uk/Published/Notice/releases/cc416e08-be3f-4a29-939a-a40d1ad517cc.json
AHU Install @ Good Hope Hospital The air handling unit is required for this project as follows: 1) 1No. Supply and extract air handling unit with heat recovery 2) The air handling unit is to be located on the flat roof in a purpose built roof top plantroom adjacent to the existing Theatre 7 AHU and existing Building 95 chillers as indicated below. 3) The manufacturer shall include for lifting the AHU sections onto a pre prepared support structure on the roof and for assembling it in situ ready for future connection by a mechanical contractor. As a minimum the roof of the plantroom enclosure will not be built until the AHU sections are craned into position and fully assembled. 4) The new air handling unit is required to be delivered and in place on the roof by the 31st March 2021

Status: active

Street address: George Road
Locality: Birmingham
Postal code: B15 1NU
Country: England

Get free access to our Tenders & Grants Database

Our service is free of charge and will always be

Join Now

Donors

Find out more