Back to tenders & grants page
Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston -Weapons Station, Goose Creek, South Carolina Construction & Engineering Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston -Weapons Station, Goose Creek, South Carolina
Receive Tenders like this by email

Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston -Weapons Station, Goose Creek, South Carolina

Repair HVAC Dormitory Building 2405 and 2406 at Joint Base Charleston -Weapons Station, Goose Creek, South Carolina has been closed on 10 Dec 2020. It no longer accepts any bids. For further information, you can contact the DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AMC.FA4418 628 CONS PK

Bellow, you can find more information about this project: 

Location: United States

General information

Donor:

DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AMC.FA4418 628 CONS PK

Industry:

Construction & Engineering

Status:

Closed

Timeline

Published:

25 Nov 2020

Deadline:

10 Dec 2020

Value:

Not available

Contacts

Description

https://sam.gov/opp/703f024d7ad44c55bb26dc5c2b447c15/view?keywords=&sort=-modifiedDate&index=opp&is_active=true&page=1

**Please see Amendment 5 for current changes. 

The proposal due date has been extended from 1 December 2020 at 3:00 PM EST to 10 December 2020 at 3:00 PM EST.****

**Please see Amendment 4 for current changes.  Attachment 14 and 15 have been attached.

1. Add Attachment 14 -As-Built Drawings for Buildings 2405 and 2406 Memorandum. The memorandum states, potential offerors will need to email [email protected] for the DoD SAFE link to the
drawings, because of the file size. Once an email is received, the DoDSAFE link for the As-Built
drawings will be sent to the offereor.
a. Building 2405 is labeled number 7 and building 2406 is labeled number 6 in the As-Built
Drawings.
2. Update CLIN 0003. It is now CLIN 0003 - Bid Option #1: Fire Alarm System Replacement for BEQ
2405.
3. Add CLIN 0004 - Bid Option #2: Fire Alarm System Replacement for BEQ 2406.
4. Post Sign-In sheet from the site visit on 18 November 2020 at the Weapons Station.
5. Add deadline for offeror questions from the second site visit. Questions are due 20 November
2020 at 3:00 PM.

**Please see Amendment 3 for current changes.  Attachment 10, 11, 12, and 13 have been attached.  Proposal Due date is now 1 December 2020 at 03:00 PM EST.** 

**Please see Amendment 2 for current changes.  Attachment 7,8, and 9 have been attached.  

**THE SOLICITATION NUMBER HAS CHANGED FROM FA4418-20-R-0016 TO FA4418-21-R-0002 due to the fiscal year changing from FY20 to FY21**

Repair HVAC Dormitory B2405/2406 - The work includes exterior wall repairs and modifications, complete removal and replacement of all exterior sealant joints including all liquid applied sealants, backer rods and silicone tape system on exterior walls at building expansion joints. Metal roof repairs and modifications.

Roof gable louvers will be removed to provide access for removal of existing mechanical equipment and installation of new mechanical equipment. After the new mechanical equipment have been placed in the mechanical attic space a new louver with insulated closure panel will be installed. New backer rod and sealant will be installed around the perimeter of new louvers to provide a sealed condition. Perform an asbestos/lead survey before working.

In the attic of each wing, replace the existing variable air volume air handling unit and dedicated outdoor air handling unit with a single new variable air volume air handling unit and an inline supply fan. Replace the existing energy recovery module (ERM), exhaust fan (EF), and filter modules. Replace a portion of the chilled water piping and ductwork such that the new equipment can be installed. Test the existing fire dampers and replace any fire dampers that are found to be faulty.

Existing hip and ridge beams are to be supported by temporary screw jack shoring. Existing HSS columns and anchor bolts to be removed. Existing base plate of columns to be removed, and new base plate w/ alternate bolt pattern to be installed on existing columns. After equipment is removed and replaced, columns shall be reinstalled w/ epoxy anchors into existing concrete. 