Ministry of Mining and Energy (MoME) of Republic of Serbia has announced on 12 Nov 2020 that is accepting bids for the following project: Serbia-Belgrade: Architectural, construction, engineering and inspection services.
The tender will take place in Serbia and will cover the Construction & Engineering industry.
The value of this project has not been disclosed by the donor and you can apply until Deadline date
After the deadline, Global Database will announce the contract award for Serbia-Belgrade: Architectural, construction, engineering and inspection services. In order to stay up-to-date with this tender and also to receive daily notifications about similar projects, you can subscribe to our newsletter for free.
Bellow you can find more information about the tender description and the bidding procedure.
Location: Serbia
Ministry of Mining and Energy (MoME) of Republic of Serbia
Construction & Engineering
Accepting bids
12 Nov 2020
Not available
Not available
Biljana Apostolović
+381 113604480
Prior information notice
This notice is for prior information only
Services
Section I: Contracting authority
Section II: Object
‘Energy Efficiency in Public Buildings and Renewable Energies in the District Heating Sector (‘Greening the Public Sector’)’ VMA
Qualified independent consultants are invited to submit prequalification documents for consulting services for the implementation of the a.m. project. The project comprises the energy efficient reconstruction and modernization of VMA hospital in Belgrade.
The Consultant shall act as Project Management Office (PMO). The PMO respectively the PMO Agent shall be responsible for preparation, project management, coordination and supervision of works, supplies and services of the VMA Project. It shall manage and control the overall project planning and implementation process as well as subcontract and administer sub-consultants for future components. The Consultant will fulfill the role of a FIDIC Engineer.
The VMA Project concerns the energy efficient rehabilitation and modernization of the hospital VMA in Belgrade (the largest hospital in Serbia and maybe in EU) with high standard in medical practice.
The complete rehabilitation of the VMA shall be performed in three stages. This VMA Project, ca. EUR 100 million, is considered as stage 1 of the entire rehabilitation. The VMA Project can be sub-divided into four main intervention areas:
1) Technical systems and installations
(a) upgrading and/or replacement of building automation, heating and cooling system, room conditioning and lighting;
(b) replacement of hot and cold water distribution and installation of new pumps;
(c) installation of renewable energy e.g. photovoltaic, solar thermal energy.
2) Building related interventions
(a) replacement of windows and concrete repairs including monitoring and investigation of cracked elements;
(b) renewing roofs and upgrade insulation of ceilings to unheated rooms;
(c) further smaller measures (incl. airlocks to major entrance area).
3) Hospital function related measures
(a) upgrading and/or installation of fire safety, Hygiene and general comfort improvements;
(b) energy efficient reconstruction of OT (operating theaters) and IC (intensive care);
(c) internal building refurbishment (in selected areas).
4) Consultant services (shall include but not limited to)
(a) elaborate detailed studies including study visits;
(b) collect necessary data for Designs and Designs preparation;
(c) elaborate preliminary design, detailed design and documents for all necessary permits,
(d) conduct tender procedure, including preparation of tender documents, assist PIU in tender publishing, evaluation of bids and assist PIU in contract negotiation with best bidder;
(e) works implementation, incl. on-site supervision during all construction works, verification of quality and quantity of executed works, release of payments; etc.
(f) provide project management services and plan and implement communication and visibility activities;
(g) introduce further accompanying measures plus other small measures.
The rehabilitation of the VMA Project can be categorized as sophisticated and complex. The areas of intervention are highly interdependent, several deeper analyses are necessary and the determination of designs and technologies is yet to be made. Moreover, a full operation during the whole construction period has to be ensured. This may require interim solutions, replacement measures and temporary outsourcing. These characteristics distinguish the VMA Project from other, classical Financial Cooperation projects and call for a different type of consulting support. Therefore, a Project Management Office (PMO) concept shall be applied.
PMO shall be established and be responsible for the further preparation, project management, coordination and supervision of works, supplies and services of the VMA Project.
Envisaged PMO structure of works: generally, the scope of works should be sub-divided into a fixed and a flexible package. The fixed package encompasses the management and control of the overall project planning and implementation process, whereby the flexible package comprises still to be selected experts and sub-consultants. The successful applicant for the fixed package shall pre-select, subcontract and administer the future components of the flexible package, worth up to 50 % of the fixed package costs.
The PMO shall take on the role of a FIDIC engineer for the VMA Project.
The award of the consulting services is planned for beginning 2021. The overall implementation of the project is expected to be completed within 72 months plus 12 months of DLP.
The prequalification will be guided by the latest version of the ‘Guidelines for the Procurement of Consulting Services, Works, Plant, Goods and Non-Consulting Services in Financial Cooperation with Partner Countries’.
Section IV: Procedure
Section VI: Complementary information
More detailed information about the project, content and form of the application documents and the scope of services of the Consultant can be requested from the Tender Agent (TA). Without this information, it might not be possible to produce a compliant Expression of Interest.
Detailed Terms of Reference will be provided to consultant that submitted an expression of interest and that have been successfully prequalified.
For any request to or correspondence with the TA, the responsible person of the Employer shall be taken in cc.
Tender Agent:
Uwe Settelmaier, Dipl. Ing. (FH) Erbacher Straße 3
68549 Ilvesheim
Germany
E-Mail: [email protected]
Hanna Slobodyanyuk-Montavon, LL.M. Schöneberger Str. 9
10963 Berlin
Germany
E-Mail: [email protected]
Employer:
Republic of Serbia
Ministry of Mining and Energy Nemanjina 22-26
11000 Belgrade, Republic of Serbia
Aleksandar Puljević
+381113604439
Biljana Apostolović
+381113604480
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page