Sierra Leone Energy Sector Utility Reform Project has been closed on 08 Jun 2022. It no longer accepts any bids. For further information, you can contact the Electricity Ditribution and Supply Authority
Bellow, you can find more information about this project:
Location: Sierra Leone
Electricity Ditribution and Supply Authority
Not available
Closed
10 May 2022
08 Jun 2022
600000
Specific Procurement Notice
Request for Bids
Goods
(One-Envelope Bidding Process)
Country: Sierra Leone
Name of Project: Energy Sector Utility Reform Project -Additional Financing (ESURP-AF)
Contract Title: Supply of MV and LV Network Material and Accessories
Loan No.: IDA-64110
RFB Reference No.: SL-EDSA-289038-GO-RFB
2. The Electricity Distribution and Supply Authority (EDSA) now invites sealed Bids from eligible Bidders for Supply of MV and LV Network Material and Accessories as summarized below:
Table 1 - Summary Scope of Supply of MV and LV Network Material and Accessories
Item N° | Description of Goods | Unit | Qty | Period | |
1. | 11kV Polymer Post Insulator c/w accessories (1 phase) | No | 180 | 30 days |
|
2. | 11kV Polymer Tension Insulator c/w accessories (1 phase) | No | 65 | 30 days |
|
3. | 120 sqmm Bare AAC Conductor | km | 8 | 30 days |
|
4. | 50 sqmm Bare AAC Conductor | km | 4 | 30 days |
|
5. | 11kV Cross arm Angle c/w straps and B&N | Set | 50 | 30 days |
|
6. | 11kV Lightning Arrester with disconnector (1 phase) | No | 36 | 30 days |
|
7. | 9m Wood pole – Class 3 or 4 | No | 500 | 30 days |
|
8. | 11m Wood pole – Class 4 | No | 50 | 30 days |
|
9. | 12m Wood pole – Class 4 | No | 40 | 30 days |
|
10 | 11 kV ABC Cable (3x70+50 sqmm Al) | km | 5 | 30 days |
|
11. | 0.4 kV ABC Cable (3x95+70 sqmm Al) | km | 8 | 30 days |
|
12. | 0.4 kV ABC Cable (3x70+50 sqmm Al) | km | 10 | 30 days |
|
13. | 0.4kV, 4 – core 120sqmm XLPE/SWA/PVC copper cable | km | 1 | 30 days |
|
14. | 0.4kV, single core 240sqmm XLPE/SWA/PVC copper cable | km | 1 | 30 days |
|
15. | 3C x 240mm2, 11kV XLPE/SWA/PVC Cu cable | km | 1 | 30 days |
|
16. | 3C x 185mm2, 11kV XLPE/SWA/PVC Cu cable | km | 1 | 30 days |
|
17. | 33kV Cable Single Core Termination kits (set of 3-phase, 240 - 400mm2) | Set | 10 | 30 days |
|
18. | 33kV Cable Straight Through Jointing Kits (Heat Shrinkable) ( 3-phase, 240 - 400mm2) | Set | 10 | 30 days |
|
19. | 11kV Cable Three Core Termination kits (set of 3-phase, 185 - 240mm2) | Set | 40 | 30 days |
|
20. | 11kV Cable Straight Through Jointing Kits (Heat Shrinkable) (set of 3-phase, 185 - 240mm2) | Set | 40 | 30 days |
|
21. | Tap-off connector (Piecing Screw type) | No | 400 | 30 days |
|
21. | 11kV Stay Equipment Complete (Dwg. ESURP AF/ 11kV/DWG/STAY) | Set | 50 | 30 days |
|
22. | LV Stay Equipment Complete (Dwg. ESURP AF/LV/ DWG/STAY) | Set | 70 | 30 days |
|
3. Bidding will be conducted through National Competitive Procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” dated July 2016 revised November 2017 and August 2018 (“Procurement Regulations”), and is open to all eligible Bidders as defined in the Procurement Regulations.
4. Interested eligible Bidders may obtain further information from Electricity Distribution and Supply Authority (EDSA), Attn: Emmanuel Ozigbo, E-mail: [email protected]; [email protected]; Cc [email protected] and inspect the bidding document during office hours 09:00 to 17:00 hours at the address given below.
5. The bidding document in English may be purchased by interested Bidders upon the submission of a written application to the address below and upon payment of a nonrefundable fee of SLL 500,000 (Five Hundred Thousand Leones). The method of payment will be by direct payment to EDSA account:
Below is the Bank details:
Name of Bank: GURANTY TRUST BANK (SL) LTD
Account Name: ENERGY SECTOR UTILITY REFORM PROJECT/EDSA
ORIGINAL FINANCING
Account Number: 201/3143594/1/1/0
Swift Code: GTBI SL FR
Corresponding Bank Details:
Corresponding Bank Details 2:
Name of Bank: STANDARD CHARTERED BANK, NEW YORK.
Swift Code: SCBL US 33
Submission of the payment advice will serve as evidence to collect the Bidding Documents. An additional amount will be charged for deliveries by courier.
6. Bids must be delivered to the address below on or before 12:00 Noon (Freetown Local Time), 8th June 2022lectronic bid submission is permitted. For bid submission, bidders send an email to a specified email address in the bidding documents with either (i) the encrypted bid or (ii) password protected documents as an attachment(s)
Important Electronic Bid Submission Information: Electronic Bids Must be sent to the following emails:
Any electronic submission that is not sent to the e-mails provided above will be rejected.
Late Bids will be rejected. Bids will be publicly opened electronically in the presence of the Bidders’ designated representatives at the address below at 12:15 p.m. (Freetown Local Time), 8th June 2022
7. All Bids must be accompanied by a Bid Security of SLL 150,000,000.00.
8. The address(es) referred to above is (are):
For inspection and purchase of bidding documents: ESURP Procurement Unit Attn: Emmanuel Ozigbo Project Implementation Team EDSA 17 E Wilkinson Road, Freetown, Sierra Leone Floor: Ground Floor | For Submission of bids: The Director General Electricity Distribution and Supply Authority 5A High Broad Street, Murray Town, Freetown, Sierra Leone Floor/ Room No: 3rd Floor, Conference Room |
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page