TA-9925 REG: Southeast Asia Transport Project Preparatory Facility Phase 2 - Project Preparation for Timor-Leste Public Transport Project (52084-002) has been closed on 26 May 2022. It no longer accepts any bids. For further information, you can contact the Asian Development Bank
Bellow, you can find more information about this project:
Location: East Timor
Asian Development Bank
Not available
Closed
12 May 2022
26 May 2022
645000
Daisuke Mizusawa
A. INTRODUCTION 1. The Government of Timor-Leste has requested Asian Development Bank (ADB) to utilize a transaction technical assistance facility (F-TRTA), Southeast Asia Transport Project Preparatory Facility, Phase 2, to provide project preparation support for the proposed Timor-Leste Public Transport Project. 2. The proposed Timor-Leste Public Transport Project (TLPTP) will support the government of Timor- Leste’s planned public transport reforms to provide, (i) a high-quality, sustainable public transport system that meets the needs of users for safety, comfort, security, convenience, affordability, accessibility and availability, and (ii) a transparent and stable regulatory environment that encourages ongoing private sector investment and operations . The project is planned to reform interurban land transport and strengthen the position of Dili as the transport hub by integrating bus routes and providing convenient and comfortable bus terminals. 3. Paris Alignment. The TLPTP will be aligned with the Paris Agreement. 4. The TLPTP will be aligned with the project impact: that a modern, integrated, growing, inclusive public transport system is built for all the citizens of Timor-Leste. The outcome of the project will be that an integrated public transport system exists, is functioning and is part of the integrated connectivity of Timor-Leste. The outputs of the project will be: 5. Output 1: Public transport facilities and services meet the needs of users for safety, comfort, security, convenience, affordability, accessibility and availability and are inclusive of the transport-disadvantaged, including women, children, elderly, and persons with disabilities. 6. Output 2: Implementation, operation and management capacity is established to improve the sustainability of public transport facilities and services 7. In response to the government’s request for preparatory action for the proposed TLPTP, ADB are providing support for the development of the public transport master plan that defines the scope of the proposed project. The master plan is being developed in line with the Government’s “efforts to expand and modernize facilities such as terminals and the various public transport services” . The master plan will provide a rapid assessment of the public transport based on currently available information and develop a plan including routes and design of terminals for interurban bus transport that are to be developed in multiple phases. The master plan will be complemented by the institutional and regulatory land transport sector reforms planned by the government. 8. CAFI (Conselho de Administração do Fundo Infraestrutura (Council for the Administration of the Infrastructure Fund) is the executing agency (EA), and MTC (Ministry of Transport and Communications) is the implementing agency (IA). The IA has proposed an indicative list of public transport improvements to be included in the project (Appendix 1). Such indicative locations will be studied as part of the ongoing activities for the development of the public transport master plan, and confirmed during the services to be performed under this assignment (“Services”). 9. ADB requires a consulting firm (the “Consultant”) to support the preparation of the TLPTP, ensuring all analysis is undertaken and documents prepared to explore the prospective ensuing loan, and permit the project to be submitted to ADB’s Board of Directors for approval. The specific scope for the ADB ensuing loan is still subject to confirmation during the Services. B. DURATION AND LOCATION OF SERVICES 10. The assignment shall be completed within 26 months from the date of issuance of the Notice to Proceed under the Contract, with the major deliverables to be finalized within 10 months. It is expected that the Consultant will commence its services in Q4 2022, and the international and national specialists will undertake field missions appropriate to the requirements of the ToR. C. SCOPE AND OUTPUTS 11. The Consultant will conduct (i) review of the demand, engineering, architectural, and cost studies and routing and phasing options included in the Public Transport Master Plan , (ii) financial sustainability and viability analysis and management assessments to inform investment decisions and ensure ongoing sustainability and operation of the TLPTP facilities, (iii) Strategic Procurement Planning, and (iv) gender and social development assessments. The Consultant will propose options for phasing plan and program of the public transport system. The Consultant will also explore other innovative features such as e-vehicle and automated integrated transport system to ensure the project is Paris aligned and to close the digital divide, crowd in digital infrastructure investment and build policy environment that supports universal and equitable digital and public transport access inclusive and long-term prosperity and resilience. The solutions may include needs assessment, identification, and adoption of context-appropriate innovative technology solutions including relevant clean energy sources. 12. The detailed outline terms of reference is attached.
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page