Construction & Engineering
Ukraine-Kharkiv: Construction work for tunnels, shafts and subways
Ukraine-Kharkiv: Construction work for tunnels, shafts and subways has been closed on 31 Mar 2022. It no longer accepts any bids. For further information, you can contact the Communal Enterprise «Kharkivsky Metropoliten»
Bellow, you can find more information about this project:
Location: Ukraine
Communal Enterprise «Kharkivsky Metropoliten»
Construction & Engineering
Closed
01 Oct 2022
31 Mar 2022
Not available
Contract notice
Works
This contract will be financed by the European Investment Bank (EIB) and is subject to the EIB's Guide to Procurement.
Section I: Contracting authority
Section II: Object
Extension of the existing metro line by 3.47 km and construction of 2 metro stations
The Contract 1A - "Extension of existing metro line by 3.47 km and construction of 2 metro stations" envisages the extension of existing Oleksiivska (Green) metro Line of the Kharkivsky Metropoliten by 3.47 km in the densely built-up areas of residential and commercial buildings and structures, including design, construction, testing and commissioning of the new section of the metro line with 2 underground stations and remedying defects during the Defects Notification Period.
The contract will be implemented under the FIDIC conditions of contract for plant and design-build, First Edition 1999 (Yellow Book)
This procurement is Two Stage Open Tender which is subject to the EBRD's Procurement Policies and Rules and it is open for participation from any country unless otherwise specified in the procurement documents.
The procurement is carried out via the EBRD Client E-Procurement Portal (ECEPP). If you intend to participate in any procurement, please ensure that you have registered in ECEPP (https://ecepp.ebrd.com). All communication with the Communal Enterprise «Kharkivsky Metropoliten» in respect of the tender process including requests for clarifications and responses shall be sent and received only using the relevant ECEPP message Centre.
The resulting contract will be financed out of the proceeds of loans from the European Bank for Reconstruction and Development (the EBRD, the Bank) and the European Investment Bank (the EIB).
The Contract 1A - "Extension of existing metro line by 3.47 km and construction of 2 metro stations" envisages the extension of existing Oleksiivska (Green) metro Line of the Kharkivsky Metropoliten by 3.47 km in the densely built-up areas of residential and commercial buildings and structures, including design, construction, testing and commissioning of the new section of the metro line with 2 underground stations and remedying defects during the Defects Notification Period.
The extension starts at the already existing part of the route south of the station Metrobudivnykiv and leads south to the planned stations Derzhavinska and Odeska. The alignment crosses the Gagarina Avenue at a very acute angle. From there, the alignment remains on the western side of Gagarina Avenue, underpasses the railway line and continues in a straight alignment to the Odeska station. South of the Odeska station, a four-rail dead end with associated switches is located.
The metro expansion comprises a diverse range of design and construction works, as well as the supply and installation of track and other equipment of the new metro line section.
The contract will be implemented under the FIDIC conditions of contract for plant and design-build, First Edition 1999 (Yellow Book).
Detailed technical and financial requirements; eligibility and qualification requirements; contract Commencement Date; Time for Completion; any response requirements; any other relevant information is included in the procurement documents.
Alternative tenders are permitted.
Participants may submit alternative tenders submitting all requested documents in addition to the requested tender (main tender).
The alternative offer shall additionally include completed technical justifications about the proposed change and shall meet performance and technical criteria specified in the tender documents.
Detailed information and requirements regarding allowed alternatives are provided in the tender documents.
Section III: Legal, economic, financial and technical information
Section IV: Procedure
https://ecepp.ebrd.com/
Tender opening shall take place and the respective minutes shall be sent to the participants automatically via ECEPP.
Section VI: Complementary information
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Tender
21 Dec 2021
Ukraine
Ukraine-Lozova: Heating works
Public Utility Company “Teploenerho”
Tender
26 Nov 2021
Ukraine
Ukraine-Kamianske: Thermal insulation work
Kamianske City Council
ASIAN INFRASTRUCTURE INVESTMENT BANK
EURASIAN DEVELOPMENT BANK
FOREIGN & COMMONWEALTH OFFICE
DEUTSCHE GESELLSCHAFT FUR INTERNATIONALE ZUSAMMENARBEIT
INTERNATIONAL CRIMINAL COURT
ITF ENHANCING HUMAN SECURITY
NATIONAL HIGHWAY AUTHORITY
NORDIC INVESTMENT BANK
PACIFIC ISLANDS FORUM SECRETARIAT
UN HIGH COMMISSIONER FOR REFUGEES
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page