The framework agreement concerns annual inspection (safety and condition assessment) and maintenance of fasteners for fixed equipment indoors in gyms, sports facilities, swimming pools and cultural centres. The purpose is to safeguard requirements concerning systematic internal inspections (cf. The Internal Control Regulation) when using fixed sports equipment, lifting and sliding walls, and requirements for expert control of work equipment (studio and stage rigs) and water slides, cf. regulations on performance of work (chap. 13), to ensure the safety of the users of the equipment/buildings.
Barnas byrom (Bymiljøetaten) [the Agency for Urban Environment] currently carries out ordinary control of sports equipment and other fixed equipment outdoor on municipal playgrounds, schools and nursery schools, with the exception of climbing walls over three metres high, where control is included in this contract.
Maintenance means replacement of worn out parts, improvement and repair of errors and lack of fasteners.
The contract is intended to cover the need for the best possible maintenance of the municipal buildings that at all times are managed by the Agency for Buildings and Property, but other agencies will also have the opportunity to utilise the framework agreement as needed.
See Appendix 4A Price Form for a more detailed overview of the facilities operated by the Agency for Buildings and Property.
The controls primarily include the following assignments:
— control of equipment with fasteners indoors (in sports halls/gyms/training rooms/swimming pools), and outdoors (only for climbing walls over three metres high), including:
— lowerable sports equipment;
— beams, gymnastic rings, slings, boxing bags, etc., including wires, chains, stays etc.;
— climbing ropes etc.;
— ribbed walls;
— bouldering walls and climbing walls indoors and climbing walls over three metres high outdoors (the entire construction);
— goals (handball/football), including control of fasteners for goals, both in use and storage;
— basketball rings;
— starting blocks;
— diving boards;
— bungee (ropes with pulleys and couplings connected to belts, for use in advanced diving training);
— ordinary control of water chutes, including independent third party control of water chutes over two metres (expert control);
— guard net/grate/securing (for fixtures, windows, lights and ventilation);
— other relevant fixed equipment.
Lifting and sliding walls:
— control and possibly retraction of screw for fastening to roof structures;
— lubrication of bearings on lift axle and possibly other moving points;
— control and possibly retraction of shackles, wire clamps, steel clamps etc.;
— control and possible replacement of hoisting straps or hoisting cable;
— adjustment of end stop up/down for the wall;
— control and possible replacement of bolts and pulleys in life axle;
— control of attachments and joints on sound traps in walls and ceilings;
— control of motor for attachment, moving parts and possibly oiling trough.
The list above is not exhaustive.
Studio and stage rigs
— expert control of work equipment as specified in §13-1 in the regulation concerning execution of work, carried out in accordance with requirements in chapter 13.
The contract includes delivery of products that are necessary to repair and maintain equipment included in the contract.
NB: the purchase and installation of new sports equipment is not included in this contract.
The overview of equipment and buildings is not exhaustive and may be subject to supplementation and amendment during the contract period.
For some facilities, ordinary inspections are carried out mainly by our own operating personnel, including among others for ADO.
A tender conference will be held 25 February 2021, 13.00 on teams. Interested parties are requested to register via Mercell and provide an email address for the invitations. Deadline 24 February 2021, 14:00.