The purpose of the procurement is to engage a turnkey contractor for the execution of contract 4211
High voltage system - Internal system for the project New Hospital in Drammen, that will be responsible for
the delivery of high voltage systems - Internal system.
The Project New Hospital in Drammen [Norwegian abbreviation PNSD] includes buildings with a total area of approx. 122,000 m2. The site
is 150 decare, and is located in the existing industrial site at Brakerøya as far as Drammenselva
and near the railway station. Construction began in autumn 2019 and the hospital must be ready for clinical
commissioning by 06.01.2025.
The project consists of the following buildings (building number in parentheses):
Ward Buildings Part 1 and 2 (161 and 162)
Treatment Buildings Part 1 and 2 (121 and 122)
Outpatient Buildings Part 1 and 2 (151 and 152)
Service Buildings (140)
Access Buildings (110)
Psychiatry Buildings Part 1, 2 and 3 (131, 132 and 133)
Glass covered walkways Part 1 and 2 (123 and 134)
Helicopter platform (163)
This contract will ensure internal high voltage ring for normal power and emergency power between
the grid stations in the buildings as well as development of transformer and high voltage switching station in all transformer rooms.
Furthermore, remote control and monitoring of cables for high voltage to Giltre Energi Produksjon (see
Interface Annex C20).
Eight grid stations will be established in the following buildings:
Grid station normal power Treatment building East
Grid station emergency power Treatment building East
Grid station normal power Treatment building West
Grid station emergency power Treatment building West
Grid station normal power Service building
Grid station emergency power Service building
Grid station normal power Psychiatry
Grid station emergency power Psychiatry
The contract will cover High Voltage Systems - Internal systems through the project New Hospital in Drammen.
The tenderers must ensure good and coordinated progress of their deliveries, as well as provide assistance
in connection with completion. This will be in the form of testing, readying, commissioning of the the systems
And FDV documentation in accordance with applicable plans and assumptions about the area.
The tenderer will, in an interaction phase after the contracting, assist with planning the timing of the work together with other contractors.
Together with other contractors. Further details on this work are in annexes C1, E6, and F2.
EPD documents must be submitted to the degree that they are available for the contract's deliveries. Refer
Also to project requirements for environment, climate and energy (NOP in Annex D2 chapter 10).