Rehabilitation of remaining works of Tianeti- Akhmeta- Kvareli- Ninigori Road Section Rehabilitation (from km 1 to km 30)
Rehabilitation of remaining works of Tianeti- Akhmeta- Kvareli- Ninigori Road Section Rehabilitation (from km 1 to km 30) has been closed on 29 Nov 2021.
It no longer accepts any bids. For further information,
you can contact the World Bank
Bellow, you can find more information about this project:
General information
Donor:
World Bank
Industry:
Transport & Logistics
Status:
Closed
Value:
Not available
Timeline
Published:
28 Oct 2021
Deadline:
29 Nov 2021
Contacts
Name:
Not available
Phone:
Not available
Email:
Not available
Description
https://devbusiness.un.org/content/rehabilitation-remaining-works-tianeti-akhmeta-kvareli-ninigori-road-section-rehabilitation Country: Georgia Project Id: P149953 Project Name: Secondary Road Asset Management Project Loan/Credit/TF Info.: IBRD-85990 Notice Version No.: 0 General Information Notice Type Invitation for Bids Borrower Bid Reference SRAMP/CW/NCB-13 Bid Description Procurement of Tianeti- Akhmeta- Kvareli- Ninigori remaining works Language of Notice English Deadline for Application Submission Date 2021/11/29 Local Time 15:00 Selected category codes for product to be procured 72141104-Highway and road resurfacing service Contact Information on Advertisement Organization/Department Roads Department of Georgia Name Giorgi Tsereteli Title Chairman of Roads Department Address 12 Al. Kazbegi Avenue, Tbilisi, 0160, City Province/State Postal Code Country Georgia Phone +(995 32) 2 31 30 76 Fax Email george.tsereteli@georoad.ge Website www.georoad.ge Detailed Information for Advertisement INVITATION FOR BIDS GEORGIA Secondary Roads Asset Management Project (SRAMP) Contract Title: Rehabilitation of remaining works of Tianeti- Akhmeta- Kvareli- Ninigori Road Section Rehabilitation (from km 1 to km 30) Bid invitation No. SRAMP/CW/NCB-13 Georgia has received financing from the World Bank towards the cost of the Secondary Roads Asset Management Project (SRAMP) and intends to apply part of the proceeds toward payments under the contract: Rehabilitation of remaining works of Tianeti- Akhmeta- Kvareli- Ninigori Road Section Rehabilitation (from km 1 to km 30) The Project Implementing Agency, the Roads Department of the Ministry of Regional Development and Infrastructure of Georgia now invites eligible bidders to submit their bids for execution of these works. Implementation period for execution of works is 12 months. The estimated cost of proposed works is GEL 13,798,496 including all taxes, duties and other levies. However, it is the responsibility of the bidder to submit a bid price, which could be below or above the estimated cost, based on the current market prices and any other factors, which may influence the pricing of the proposed works. Bidders shall meet the following minimum qualifying criteria to qualify for award of the contract: The Bidder shall demonstrate that it has access to, or has availability to liquid assets, unencumbered real assets, lines of credit (the letter from the bank must demonstrate bank’s commitment to provide financing in case if the Bidder will be successful in subject tender. Letters from a bank only demonstrating bank’s intention to finance bidder without any commitment may not be accepted by the Employer during evaluation and may be subject to clarification), and other financial means (independent of any contractual advance payment) sufficient to meet the construction cash flow requirements estimated as GEL 3,400,000.00 for the subject contract(s) net of the Bidders other commitments; Minimum average annual turnover of GEL 13,750,000.00 calculated as total certified payments received for contracts in progress and/or completed within the last 3 years (2018; 2019 and 2020), divided by 3 years; Experience under civil works contracts in the role of prime contractor, JV member, sub- contractor, or management contractor for at least the last 5 years, starting 1st January 2016. A minimum number of similar contracts specified below that have been satisfactorily and substantially completed (substantial completion shall be based on 80% or more works completed under the contract) as a prime contractor, joint venture member, management contractor or sub-contractor between 1st January, 2016 and bid submission deadline: at least one (1) contract for paved roads construction/reconstruction/rehabilitation with minimum value of GEL 11,000,000.00 or two (2) contracts for paved roads construction/reconstruction/rehabilitation with minimum value of GEL 5,500,000.00 of each contract; For the above and any other contracts completed and under implementation as prime contractor, joint venture member, management contractor or sub-contractor on or after the first day of the calendar year during the period stipulated in 4.2 (a) above, a minimum construction experience in the following key activities successfully completed: At least 60 000 m2 of road pavement rehabilitation / reconstruction / construction works completed during any year. A complete set of bidding documentation in English language in electronic format can be downloaded for free. Bids shall be submitted electronically as outlined in ITB 22.1. Late bids will not be accepted. Deadline for electronic bids submission is: as stated in the state E-procurement system. Government procurement procedures SHALL NOT apply for this procurement. Bidders shall indicate bid price in electronic field in Georgian E-Government Procurement System, failing to do so, will result in rejection of such bid. Bid submission and bid opening will take place electronically using Georgian E-Government Procurement System with certain modifications. Major modifications to the Georgian E-Procurement System are: Functionality of the three rounds of e-Reverse auction is not applied. Rounds will not be applicable. The estimated cost of the contract is disclosed in the e-Procurement system and bidders can submit a bid price, which could be below or above the estimated cost, however pricing the bid is the responsibility of the bidder which shall be based on the current market prices and any other factors which may influence the pricing of the proposed works. Please note that bidding is conducted under National Competitive Bidding procedures as specified in the World Bank’s Guidelines: Procurement of Goods, Works and Non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers January, 2011 revised July 2014 (“Procurement Guidelines”). Requests for clarification should be submitted through the Georgian E- Government Procurement System. All bids should be submitted together with the Bid Security Declaration. Bid Security Declaration shall be valid for 28 days beyond the validity of the Bid (i.e., 120 days+28 days = 148 days). For bids submitted by a JV bidder shall carefully read ITB 19.8 as failure to comply with this ITB may be grounds for bid rejection. Secondary Road Asset Management Project Georgia Not cancelled Invitation for Bids Works Monday, November 29, 2021- 17:00 WB-P855395-10/21 IBRD-85990 SRAMP/CW/NCB-13 P149953 Roads, Bridges and Tunnels Thursday, October 28, 2021 English Thursday, October 28, 2021- 08:13 World Bank