Design Build and Operation (DBO) of Kotobe and Kitime Waste Water Treatment Plants for Eastern Addis Ababa Catchment Sewer System
Receive Tenders like this by email

Design Build and Operation (DBO) of Kotobe and Kitime Waste Water Treatment Plants for Eastern Addis Ababa Catchment Sewer System

Design Build and Operation (DBO) of Kotobe and Kitime Waste Water Treatment Plants for Eastern Addis Ababa Catchment Sewer System has been closed on 23 Feb 2021. It no longer accepts any bids. For further information, you can contact the World Bank

Bellow, you can find more information about this project: 

Location: Ethiopia

General information

Donor:

World Bank

Industry:

Energy & Utilities

Status:

Closed

Timeline

Published:

01 Jan 2021

Deadline:

23 Feb 2021

Value:

Not available

Contacts

Name:

{"Debebe Muleta"}

Phone:

{"+251911677715"}

Description

https://devbusiness.un.org/content/design-build-and-operation-dbo-kotobe-and-kitime-waste-water-treatment-plants-eastern-addis
Employer: Addis Ababa Water and Sewerage Authority (AAWSA) Project: Second Urban Water Supply and Sanitation Project (UWSSP- II) Contract title: Design, Build and Operation of Addis Ababa city Eastern Catchment Wastewater Treatment Plants (WWTPs) Country: Ethiopia Credit No.: 60070/60080 ISD No: ET-AAWSA-180438-CW-RFP Issued on: 7th   January 2021    The Government of Federal Democratic Republic of Ethiopia has received financing from the World Bank toward the cost of the Second Urban Water Supply and Sanitation Project (UWSSP- II), and intends to apply part of the proceeds toward payments under the contract for Design, Build and Operation of Addis Ababa city  Eastern Catchment Wastewater Treatment Plants. The Addis Ababa Water and Sewerage Authority (AAWSA) intends to initially select Applicants for Design, Build and Operation of Addis Ababa city Eastern Catchment Wastewater Treatment Plants (ET-AAWSA-180438-CW-RFP). This contract will require the design and Build (3 years) and operation (15 years) of two wastewater treatment plants serving the city of Addis Ababa. The wastewater treatment plants will utilize a conventional activated sludge process and each has a design capacity of 54,000 m3/day. The wastewater treatment plants will be located in two different sites, one adjacent to the current waste stabilization ponds in Kotebe (coordinates: 483706, 991523 Adindan / UTM 37N) and the second one on a greenfield site in Kitime (coordinates: 481824, 989695 Adindan / UTM 37N). Key Qualification Requirements are:   Financial Capabilities: sufficient financial capabilities to meet the construction cash flow requirements estimated as USD $ 7 million (USD Seven million) for the subject contract net of the Applicants other commitments.   Average Annual Turnover: Minimum average annual construction turnover of USD $ 40 million (USD Forty million) over the last five years.   DBO Experience: Experience of at least two (2) similar DBO contracts for wastewater treatment plants as prime contractor, member of a joint venture, or management contractor, which are either operational at the date of application, or in which the operations period commenced after 1st January 2010. The selected DBO contracts shall relate to treatment plants with a minimum capacity of 50,000 m3/d.   Design Experience: A minimum number of two (2) contracts for the design of wastewater treatment plants undertaken as design engineer between 1st January 2010 and Application submission deadline. The selected design contracts shall relate to treatment plants that have been satisfactorily and substantially completed, and each have a minimum flow of 20,000 m3/day.   Construction Experience: A minimum number of two (2) construction contracts for water or wastewater treatment plants that have been satisfactorily and substantially completed as a prime contractor, joint venture member, management contractor or subcontractor between 1st January 2010 and Application submission deadline. The value of the member’s participation in each selected construction contract shall be a minimum of US $45,000,000 (USD forty-five million).   Operation Experience: A minimum number of two (2) of similar operations contracts for wastewater treatment plants as prime contractor, member of a joint venture, or management contractor, which are either operational at the date of application, or in which the operations period ended after 1st January 2010. The selected operations contracts shall relate to treatment plants with a minimum capacity of 30,000 m3/d, have a contract period of three years or more and shall have been operating satisfactorily since commencement.  It is expected that the Request for Proposals will be made in April 2021.    Initial Selection will be conducted through the procedures as specified in the World Bank’s Procurement Guidelines; Procurement of Goods, Works and Non-Consulting services dated January 2011 and revised July 2014 (“Procurement Guidelines”), and is open to all eligible Applicants as defined in the Procurement Guideline.  Interested eligible Applicants may obtain further information from AAWSA, Water and Sanitation Infrastructures Development Division at the address below during office hours (9:00 AM to 4:00 PM local time). A complete set of Initial Selection documents in English may be obtained for free by interested Applicants on the submission of a written application to the address below or by email to the email addresses below. The documents will be sent by email.  Applications for Initial Selection should be submitted in clearly marked envelopes and delivered to the address below by 2:00 PM (local time) on 23  February 2021. Late applications may be rejected.   Office: AAWSA, Water and Sanitation Infrastructures Development Division Officer: Ms. Mestawot Abebe, Head of Procurement Department Address: 1st floor Lideta Kifle Ketema Wereda 04, around Lideta Condominium, Addis Ababa, Ethiopia Telephone: +2251 116673920 Facsimile number: +251 116623924 Electronic mail address: [email protected] and [email protected] Second Ethiopia Urban Water Supply and Sanitation Project Ethiopia Not cancelled RFP- Request for Proposals Invitation for Prequalification Works Tuesday, February 23, 2021- 02:00 WB-P633510-01/21 IDA60070 ET-AAWSA-180438-CW-RFP P156433 Notice version number: 1 General- Water and Sanitation Waste Management Water Supply and Sanitation Monday, January 4, 2021 OP00111295 English Monday, January 4, 2021- 12:30 Addis Ababa Water and Sanitation Development and Rehabilitation Project Office Debebe Muleta Telephone: 251-11-6623902 Addis Ababa +251911677715 [email protected] Sanitation, Water Supply, Public Administration- Water, Sanitation and Waste Management World Bank Wednesday, December 30, 2020- 19:00 IBRD/IDA Loans (PE) Addis Ababa Water and Sanitation Development and Rehabilitation Project Office USD 86000000.00 Design Build and Operation (DBO) of Kotobe and Kitime Waste Water Treatment Plants for Eastern Addis Ababa Catchment Sewer System Technical Manager proc_voc_id: 72121505 proc_voc_title: Waste water and sewage treatment plant construction service seg_id: 72000000 seg_title: Building and Facility Construction and Maintenance Services family_id: 72120000 family_title: Nonresidential building construction services class_id: 72121500 class_title: Industrial plant construction services cmdty_id: 72121505 cmdty_title: Waste water and sewage treatment plant construction service