Back to tenders & grants page
Owners Engineer services for the Supply, Installation and Connection of 6 Small Scale Wind Turbines with total capacity of 21 kW including 1 year Operation, Maintenance and Capacity building services. Consumer Goods & Services Owners Engineer services for the Supply, Installation and Connection of 6 Small Scale Wind Turbines with total capacity of 21 kW including 1 year Operation, Maintenance and Capacity building services.
Receive Tenders like this by email

Owners Engineer services for the Supply, Installation and Connection of 6 Small Scale Wind Turbines with total capacity of 21 kW including 1 year Operation, Maintenance and Capacity building services.

Owners Engineer services for the Supply, Installation and Connection of 6 Small Scale Wind Turbines with total capacity of 21 kW including 1 year Operation, Maintenance and Capacity building services. has been closed on 29 Nov 2019. It no longer accepts any bids. For further information, you can contact the United Nations Development Programme

Bellow, you can find more information about this project: 

Location: South Africa

General information

Donor:

United Nations Development Programme

Industry:

Consumer Goods & Services

Status:

Closed

Timeline

Published:

13 Nov 2019

Deadline:

29 Nov 2019

Value:

Not available

Contacts

Description

Overview :

The Eastern Cape (EC) Province of South Africa (SA) and the Lower Saxony State of Germany have been engaged in a longstanding twinning partnership. As part of this twinning arrangement, a mini-grid pilot project was initiated in order to electrify the small village of Upper Blinkwater (UB) in the Raymond Mhlaba Local Municipality.  With careful attention to the demand requirements of the village, the mini-grid power system was developed and includes a 75 kWp photovoltaic (PV) system, 370 kWh battery storage, and a 20 kW backup diesel generator (400 l diesel storage) – all with an integrated vending system, smart meters and demand side management interface. Currently, the UB mini-grid project does not include any wind power. The EC Government, through the Department of Economic Development, Environmental Affairs and Tourism, expressed an interest in collaborating with South Africa Wind Energy Project (SAWEP), Phase 2 to add the wind component into the UB mini-grid project.

The objectives of the consulting services shall be to ensure that the Project is implemented with a high standard of workmanship and quality, on schedule, and within the budget, in accordance with the specifications and drawings of the Contract, to acceptable environmental and social standards and in accordance with prudent engineering practice

Get free access to our Tenders & Grants Database

Our service is free of charge and will always be

Join Now

Donors

Find out more