Back to tenders & grants page
Technical Study, Detailed Design and Works Supervision for multipurpose infrastructure comprising of Dams, Ponds for livestock watering, Fingerling stations, Landing stage/Jetties and Irrigation schemes
Receive Tenders like this by email

Technical Study, Detailed Design and Works Supervision for multipurpose infrastructure comprising of Dams, Ponds for livestock watering, Fingerling stations, Landing stage/Jetties and Irrigation schemes

Technical Study, Detailed Design and Works Supervision for multipurpose infrastructure comprising of Dams, Ponds for livestock watering, Fingerling stations, Landing stage/Jetties and Irrigation schemes has been closed on 25 Jan 2021. It no longer accepts any bids. For further information, you can contact the African Development Bank

Bellow, you can find more information about this project: 

Location: Nigeria

General information

Donor:

African Development Bank

Industry:

Finance & Insurance

Status:

Closed

Timeline

Published:

11 Jan 2021

Deadline:

25 Jan 2021

Value:

Not available

Contacts

Description

https://devbusiness.un.org/content/technical-study-detailed-design-and-works-supervision-multipurpose-infrastructure-comprising
FEDERAL REPUBLIC OF NIGERIA Federal Ministry of Water Resources Request for Expression of Interest (Quality Cost Based Selection)   Country: Nigeria Project: Program for Integrated Development and Adaptation to Climate Change in the Niger Basin (PIDACC/NB) Sector: Agriculture and Water Loan Grant No: 2100150040844 Program ID: P-Z1-C00/069   The Federal Government of Nigeria (FGN) has received financing from the African Development Bank (the Bank), towards the cost of Programme for  Integrated Development and Adaptation to Climate Change in the Niger Basin (PIDACC/NB) in Nigeria and intends to apply part of the agreed amount to finance payment under the contract for the Technical Study, Detailed Design and Works Supervision for multipurpose infrastructure comprising of Dams, Ponds for livestock watering, Fingerling stations, Landing stage/Jetties and Irrigation schemes.   The PIDACC development objective is to contribute to improving the resilience of the Niger Rivers Eco-system and populations through sustainable management of natural resources.   2. The services included under this consultancy are to: Conduct technical feasibility study; Carryout Detailed Design and preparation of Bidding Documents; and, Supervision of Works.   The assignment is in support of construction/rehabilitation and managing complex projects in the area of water resources development of the following multipurpose infrastructure: Dams, Ponds for livestock watering, Fingerling stations, Landing stage/Jetties and Irrigation schemes, which will be carryout in the four (4) River Basin Development Authorities namely: Upper Benue, Upper Niger, Sokoto/Rima and Anambra-Imo.   3 The FMWR through its National Programme Coordinating Unit (NPCU) now invites eligible consultants to indicate their interests in providing these services. Interested Consultants must provide information indicating that they are qualified to perform the services (firm brochure, description of general work experience, verifiable job of similar nature, experience in similar condition in Nigeria and/or in sub- Saharan Africa, and availability of appropriate skills among staff). Consultants may constitute joint-ventures to enhance their chances of qualification.   4.         Eligibility Criteria, establishment of the shortlist and selection procedure shall be in accordance with the procurement policy for the Bank Group funded operation (Policy), October 2015 which is available on the Banks website at http://www.afdb.org.en/projectsandoperations/procurements/new-proedure-policy. O nly shortlisted candidate will be contacted.   5. The estimated duration of the assignment is Eighteen (18) months and the estimated starting date is 3 rd May, 2021   6. Interested consultants may obtain further information including the Terms of Reference (ToR) for the Assignment at the address below during office hours (8:00am to 4:00pm local time, Monday to Friday) and/or send an email to the Project Coordinator at: [email protected].   7. Expression of Interest must be delivered to the address below not later than 25 th January, 2021at 5:00pm local time and mention “Consultancy Services for “Feasibility Study, Detailed design and Work supervision” for Multipurpose Infrastructures.   National Coordinator, Program for Integrated Development and Adaptation to Climate Change in Niger Basin (PIDACC/NB), (Federal Ministry o f Water Resources) Bassan Plaza, 1 st Floor, Left Wing, No. 759 Independent Avenue, Off Herbert Macaulay Way, Centr al Business District Abuja FCT, Nigeria Email: [email protected] Tel: +234 705 921 6542 Program for Integrated Development and Adaptation to Climate Change in the Niger Basin (PIDACC/NB) Nigeria Not cancelled Request for Expression of Interest Consulting Services- Firm Monday, January 25, 2021- 11:00 AfDB-P637329-01/21 2100150040844 P-Z1-C00/069 Irrigation Livestock General- Agriculture, Fisheries and Forestry Water Supply and Sanitation Monday, January 11, 2021 English Monday, January 11, 2021- 08:06 African Development Bank

Get free access to our Tenders & Grants Database

Our service is free of charge and will always be

Join Now

Donors

Find out more