United Kingdom-London: Storm-water piping construction work has been closed on 31 Oct 2017. It no longer accepts any bids. For further information, you can contact the London City Airport Limited (01963361)
Bellow, you can find more information about this project:
Location: United Kingdom
London City Airport Limited (01963361)
Beverages
Energy & Utilities
Closed
14 Oct 2017
31 Oct 2017
Not available
Vegain Doola
Contract notice
Works
Section I: Contracting authority
Section II: Object
Airfield Drainage, Ducting and Taxiway Links.
Installation a gravity drainage system to serve the new airfield aprons, parallel taxiway. Drainage system will consist of circa 20 No manholes, varying pipe sizes connecting into a 170 m x 3 m x 2.1 m attenuation chamber, which in turn will be connected to an oil separator and pumping station. The pumping station will pump surface water to a new connection point on the existing surface water system.
Due to the construction of the new aprons and parallel taxiway new and amended links are required for the connections to the runway. The works comprise provision of all necessary people, plant, equipment, materials, temporary works and consumables to complete the tie-in works.
A new pit and duct system is required to connect the areas of new taxiway and links to the AGL systems. The scope of work within this package will be the pit and duct system which sit in the clear and graded area of the runway connecting into the new pit and duct system being constructed by another contractor.
London City Airport, Airside.
The physical scope of work includes all works necessary to design, supply, manufacture and construct the Airfield Drainage works which includes:
— Drainage
Drainage scope includes the installation of a gravity drainage system to serve the new airfield aprons, parallel taxiway and amendments to hold 27. The drainage system will consist of circa 20 No manholes, varying pipe sizes connecting into a 170 m long x 3 m wide x 2.1m deep attenuation chamber. The attenuation chamber in turn will be connected to an oil separator and pumping station. The pumping station will pump surface water to a new connection point on the existing surface water system to be located in the region of taxiway Charlie.
— Surfacing/ Tie-in works.
Due to the construction of the new aprons and parallel taxiway new and amended links are required for the connections to the runway. The works comprise provision of all necessary people, plant, equipment, materials, temporary works and consumables to complete the tie-in works.
— Airfield Ground Lighting (AGL) ducting.
A new pit and duct system is required to connect the areas of new taxiway and links to the AGL systems. The scope of work within this package will be the pit and duct system which sit in the clear and graded area of the runway connecting into the new pit and duct system being constructed by the Piling and Deck package contractor.
Criteria are set out in the pre-qualification document attached at the URL previously stated.
Please note that LCY is not a Utility or a Contracting Authority for the purposes of Directives (2004/17 and 2003/18) and that this notice is published voluntarily for publicity purposes only.
Respondents should email [email protected] with completed PQQ and associated documentation.
Section III: Legal, economic, financial and technical information
See attached PQQ.
Contract will be under NCE3 conditions for Engineering and Construction Contract Option A with LCY Amendments.
Section IV: Procedure
Section VI: Complementary information
Receive Daily Tenders and Grants notifications
Subscribe nowFeatured tenders
Enter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home pageEnter your contact details
One of our experts will be in touch shortly to arrange a convenient time to book a Demo Presentation.
Home page