DESIGN AND CONSTRUCTION OF THE EXPANSION AND REHABILITATION OF THE EXISTING MUCARI BULK WATER SUPPLY SYSTEM OF THE CITY OF N’DALATANDO has been closed on 22 Feb 2021.
It no longer accepts any bids. For further information,
you can contact the World Bank
https://devbusiness.un.org/content/design-and-construction-expansion-and-rehabilitation-existing-mucari-bulk-water-supply REPUBLIC OF ANGOLA MINISTRY OF ENERGY AND WATER FINANCIAL AND CONTRACT MANAGEMENT UNIT (FCMU-WB/AFD) Specific Procurement Notice Request for Bids Design and Build (Without Prequalification) Employer: Financial and Contract Management Unit (FCMU-WB/AFD) of the Ministry of Energy and Water (MINEA) Project: Second Water Sector Institutional Development Project (WSIDP 2) Contract title: Design and construction of the expansion and rehabilitation of the existing Mucari bulk water supply system of the city of N’dalatando Country: Angola Loan No. 8876-A RFB No: 14W3/NDALATANDO/DNA/20 Issued on: 11 January 2021 The Government of the Republic of Angola has received financing from the World Bank and the French Development Agency (AFD) toward the cost of the Second Water Sector Institutional Development Project (WSIDP 2) and intends to apply part of the proceeds toward payments under the contract for the Design and construction of the expansion and rehabilitation of the existing Mucari bulk water supply system of the city of N’dalatando. The Financial and Contract Management Unit (FCMU-WB/AFD) Ministry of Energy and Water (MINEA) now invites sealed Bids from eligible Bidders for the Engineering Design and Construction of the expansion and rehabilitation of the existing Mucari bulk water supply system of the city of N’dalatando. The Design and Build contract consists of the following phases and durations: Design phase of 4.5 months (4 months for design and 15 days for Client’s comments); Construction phase of 15 months; followed by Defects liability period (DLP) of 12 months. Bidding will be conducted through international competitive procurement using Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers- Procurement in Investment Projects Financing" dated July 2016 and revised in November 2017 (“Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations. Interested eligible Bidders may obtain further information and inspect the Bidding document during office hours 09:00 am to 03:00 pm at the address given below The Bidding document in English may be obtained free of charge by interested eligible Bidders upon the submission of a written application to the address below and may be collected electronically or at the address below. Bids must be delivered to the address below on or before 22 February 2021 at 10:00 am. Electronic Bidding will be permitted. Late Bids will be rejected. The electronic Bid opening shall be on Skype on 22 February 2021 at 10:00 am All Bids must be accompanied by a Bid Security in the amount and currency of USD 100,000.00 or an equivalent in local currency or any freely convertible currency. The address referred to above is: Financial and Contract Management Unit (FCMU-WB/AFD) Ministry of Energy and Water (MINEA) For the attention: Mr. Lucrécio Costa Street Address: Rua Via S8, Condomínio DOLCE VITA, Edifício A1, 3º andar, Talatona, Luanda Angola Telephone: +244 222024757/ 924746294 Email address:
[email protected] Second Water Sector Institutional Development Project Angola Not cancelled RFB- Request for Bids Invitation for Bids Works Monday, February 22, 2021- 10:00 WB-P636876-01/21 COFNC1560, IBRD87020, IBRD88760 14W3/N’DALATANDO/DNA/20 P151224 Notice version number: 1 General- Construction General- Water and Sanitation Water Supply and Sanitation Monday, January 11, 2021 OP00111994 English Monday, January 11, 2021- 11:51 National Directorate of Water Lucrecio Costa Rua Via S8, Condomínio DOLCE VITA, Edifício A1, 3º andar, Talatona, Luanda 222024757
[email protected] Water Supply, Sanitation, Public Administration- Water, Sanitation and Waste Management World Bank Thursday, January 7, 2021- 19:00 IBRD/IDA Loans (PE) National Directorate of Water USD 5000000.00 DESIGN AND CONSTRUCTION OF THE EXPANSION AND REHABILITATION OF THE EXISTING MUCARI BULK WATER SUPPLY SYSTEM OF THE CITY OF N’DALATANDO Project Director proc_voc_id: 72141124 proc_voc_title: Pipe laying service seg_id: 72000000 seg_title: Building and Facility Construction and Maintenance Services family_id: 72140000 family_title: Heavy construction services class_id: 72141100 class_title: Infrastructure building and surfacing and paving services cmdty_id: 72141124 cmdty_title: Pipe laying service